A PROPOSED DESIGN OF ASSEMBLY LINE FOR CN-235 PLANE'S TAIL UNIT SUB-ASSEMBLY AT PT DIRGANTARA INDONESIA

PT Dirgantara Indonesia is the only one aeronautical company in Indonesia. Main product of the company is propeller engine plans. Product that will be focused in this research is CN-235 plan. In plan production process, component assembling process take most times. The component that has the most im...

Full description

Saved in:
Bibliographic Details
Main Author: SEKAR ROSANIA - (13413046), NURIFFA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/23575
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:23575
spelling id-itb.:235752017-09-27T11:39:11ZA PROPOSED DESIGN OF ASSEMBLY LINE FOR CN-235 PLANE'S TAIL UNIT SUB-ASSEMBLY AT PT DIRGANTARA INDONESIA SEKAR ROSANIA - (13413046), NURIFFA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/23575 PT Dirgantara Indonesia is the only one aeronautical company in Indonesia. Main product of the company is propeller engine plans. Product that will be focused in this research is CN-235 plan. In plan production process, component assembling process take most times. The component that has the most imbalance line is the tail unit. There are three parts of this component, LH horizontal, RH horizontal, and Vertical. The mean absolute deviation still showing poor value, which is 54,33 hours for LH horizontal, 48,76 hours for RH horizontal, and 64 hours for Vertical. Therefore, an ssembly line will be designed for balancing and smoothing the assemby line. <br /> <br /> <br /> Model that will be used in this research is mathematical model that developed into heuristic procedure by Rachamadugu and Talbot (1991). This model aimed to minimize the mean absolute deviation of aline. The procedure was adjusted to suit the needs and characteristics of the company. The adjustments are calculating the smoothness index, omitting average station time comparation, omitting task interchange, and checking the final station time towards cycle time. <br /> <br /> <br /> Input that will be needed to resolve this problem is task data, task processing time data, used jig data, operator data, and precedence diagam. <br /> <br /> <br /> The given solution results the repair of eight sub-assembly’s precedence diagrams and 30,7% as LH horizontal’s reduction of mean absolute deviation, 51,1% as RH horizontal’s, and 45,3% as Vertical’s. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT Dirgantara Indonesia is the only one aeronautical company in Indonesia. Main product of the company is propeller engine plans. Product that will be focused in this research is CN-235 plan. In plan production process, component assembling process take most times. The component that has the most imbalance line is the tail unit. There are three parts of this component, LH horizontal, RH horizontal, and Vertical. The mean absolute deviation still showing poor value, which is 54,33 hours for LH horizontal, 48,76 hours for RH horizontal, and 64 hours for Vertical. Therefore, an ssembly line will be designed for balancing and smoothing the assemby line. <br /> <br /> <br /> Model that will be used in this research is mathematical model that developed into heuristic procedure by Rachamadugu and Talbot (1991). This model aimed to minimize the mean absolute deviation of aline. The procedure was adjusted to suit the needs and characteristics of the company. The adjustments are calculating the smoothness index, omitting average station time comparation, omitting task interchange, and checking the final station time towards cycle time. <br /> <br /> <br /> Input that will be needed to resolve this problem is task data, task processing time data, used jig data, operator data, and precedence diagam. <br /> <br /> <br /> The given solution results the repair of eight sub-assembly’s precedence diagrams and 30,7% as LH horizontal’s reduction of mean absolute deviation, 51,1% as RH horizontal’s, and 45,3% as Vertical’s.
format Final Project
author SEKAR ROSANIA - (13413046), NURIFFA
spellingShingle SEKAR ROSANIA - (13413046), NURIFFA
A PROPOSED DESIGN OF ASSEMBLY LINE FOR CN-235 PLANE'S TAIL UNIT SUB-ASSEMBLY AT PT DIRGANTARA INDONESIA
author_facet SEKAR ROSANIA - (13413046), NURIFFA
author_sort SEKAR ROSANIA - (13413046), NURIFFA
title A PROPOSED DESIGN OF ASSEMBLY LINE FOR CN-235 PLANE'S TAIL UNIT SUB-ASSEMBLY AT PT DIRGANTARA INDONESIA
title_short A PROPOSED DESIGN OF ASSEMBLY LINE FOR CN-235 PLANE'S TAIL UNIT SUB-ASSEMBLY AT PT DIRGANTARA INDONESIA
title_full A PROPOSED DESIGN OF ASSEMBLY LINE FOR CN-235 PLANE'S TAIL UNIT SUB-ASSEMBLY AT PT DIRGANTARA INDONESIA
title_fullStr A PROPOSED DESIGN OF ASSEMBLY LINE FOR CN-235 PLANE'S TAIL UNIT SUB-ASSEMBLY AT PT DIRGANTARA INDONESIA
title_full_unstemmed A PROPOSED DESIGN OF ASSEMBLY LINE FOR CN-235 PLANE'S TAIL UNIT SUB-ASSEMBLY AT PT DIRGANTARA INDONESIA
title_sort proposed design of assembly line for cn-235 plane's tail unit sub-assembly at pt dirgantara indonesia
url https://digilib.itb.ac.id/gdl/view/23575
_version_ 1822920937577644032