RECOMMENDATION OF FLEXIBLE JOBSHOP SCHEDULING PROBLEM TO MINIMIZE TARDINESS IN CV. CIPTA SINERGI MANUFAKTUR

CV. Cipta Sinergi Manufaktur (CSM) is a manufacture company that engaged in the metal industry and based on CAD/CAM technology and conventional machine. CSM adopts a flexible job shop concept with a make to order system. As it seen that the usage of CNC machine that could process more that one type...

Full description

Saved in:
Bibliographic Details
Main Author: IZRA MIRNA , RAJA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/23809
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:23809
spelling id-itb.:238092017-09-27T11:39:11ZRECOMMENDATION OF FLEXIBLE JOBSHOP SCHEDULING PROBLEM TO MINIMIZE TARDINESS IN CV. CIPTA SINERGI MANUFAKTUR IZRA MIRNA , RAJA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/23809 CV. Cipta Sinergi Manufaktur (CSM) is a manufacture company that engaged in the metal industry and based on CAD/CAM technology and conventional machine. CSM adopts a flexible job shop concept with a make to order system. As it seen that the usage of CNC machine that could process more that one type of operation (process flexibility) is high in CSM. A good plan in production scheduling is needed to not only increasing the utility of machines, but also makes delivery be on time to customers. Nowadays, CSM faced with a problem. It is about its inability to fulfill the due date order that has been agreed with the customer. It is because there are no production scheduling method that are clearly used by CSM, scheduling is done manually by intuition and production manager’s work experience. During January to October 2016, there were 61% of customer order delivery delay with average delay is 25,5 days. This study aims to determine and suggest a flexible job shop analytical production scheduling model that could minimize tardiness that in accordance with the characteristics of CSM. Reference model that been used in this study is analytical production scheduling model by Roshanaei (2012). This model has a decision variable to choose a machine that will work the operation in an optimal way, start time and completion time of each operations, and total tardiness value. This model’s inputs are due date of each jobs, operation routing, and process time of each operations. The computation of its model is helped by LINGO 11.0. The proposed production scheduling model is tested by using CSM historical data from February 20th to 26th, 2017 and resulted in a reduction of tardiness, from 94.8 hours to 78.1 hours or about 17.61%. This result indicates that scheduling with the proposed model is better than the current scheduling model. <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description CV. Cipta Sinergi Manufaktur (CSM) is a manufacture company that engaged in the metal industry and based on CAD/CAM technology and conventional machine. CSM adopts a flexible job shop concept with a make to order system. As it seen that the usage of CNC machine that could process more that one type of operation (process flexibility) is high in CSM. A good plan in production scheduling is needed to not only increasing the utility of machines, but also makes delivery be on time to customers. Nowadays, CSM faced with a problem. It is about its inability to fulfill the due date order that has been agreed with the customer. It is because there are no production scheduling method that are clearly used by CSM, scheduling is done manually by intuition and production manager’s work experience. During January to October 2016, there were 61% of customer order delivery delay with average delay is 25,5 days. This study aims to determine and suggest a flexible job shop analytical production scheduling model that could minimize tardiness that in accordance with the characteristics of CSM. Reference model that been used in this study is analytical production scheduling model by Roshanaei (2012). This model has a decision variable to choose a machine that will work the operation in an optimal way, start time and completion time of each operations, and total tardiness value. This model’s inputs are due date of each jobs, operation routing, and process time of each operations. The computation of its model is helped by LINGO 11.0. The proposed production scheduling model is tested by using CSM historical data from February 20th to 26th, 2017 and resulted in a reduction of tardiness, from 94.8 hours to 78.1 hours or about 17.61%. This result indicates that scheduling with the proposed model is better than the current scheduling model. <br />
format Final Project
author IZRA MIRNA , RAJA
spellingShingle IZRA MIRNA , RAJA
RECOMMENDATION OF FLEXIBLE JOBSHOP SCHEDULING PROBLEM TO MINIMIZE TARDINESS IN CV. CIPTA SINERGI MANUFAKTUR
author_facet IZRA MIRNA , RAJA
author_sort IZRA MIRNA , RAJA
title RECOMMENDATION OF FLEXIBLE JOBSHOP SCHEDULING PROBLEM TO MINIMIZE TARDINESS IN CV. CIPTA SINERGI MANUFAKTUR
title_short RECOMMENDATION OF FLEXIBLE JOBSHOP SCHEDULING PROBLEM TO MINIMIZE TARDINESS IN CV. CIPTA SINERGI MANUFAKTUR
title_full RECOMMENDATION OF FLEXIBLE JOBSHOP SCHEDULING PROBLEM TO MINIMIZE TARDINESS IN CV. CIPTA SINERGI MANUFAKTUR
title_fullStr RECOMMENDATION OF FLEXIBLE JOBSHOP SCHEDULING PROBLEM TO MINIMIZE TARDINESS IN CV. CIPTA SINERGI MANUFAKTUR
title_full_unstemmed RECOMMENDATION OF FLEXIBLE JOBSHOP SCHEDULING PROBLEM TO MINIMIZE TARDINESS IN CV. CIPTA SINERGI MANUFAKTUR
title_sort recommendation of flexible jobshop scheduling problem to minimize tardiness in cv. cipta sinergi manufaktur
url https://digilib.itb.ac.id/gdl/view/23809
_version_ 1822921021784588288