#TITLE_ALTERNATIVE#
Injection gas requirement of oil wells known by Gas Lift Performance Curve (GLPC) which shows the correlation between oil production rate and injection gas rate. Inefficient gas lift injection rate allocation can affect the efficiency of production wells. This affects net cash flow (NCF) obtained wh...
Saved in:
Main Author: | B. M. ADITYA PUTRA RACHMAT (NIM : 12213040), R. |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/23862 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: UTOMO (NIM 12004019), RACHMAT -
#TITLE_ALTERNATIVE#
by: LIANDA (NIM 13504114), RACHMAT -
#TITLE_ALTERNATIVE#
by: DARSONO - Nim: 13613054 , RACHMAT -
#TITLE_ALTERNATIVE#
by: ANJAR PERDANA PUTRA (NIM 12206070); Pembimbing: Dr. Ir. Sudjati Rachmat DEA., ELDIAS -
#TITLE_ALTERNATIVE#
by: FADLILAH RACHMAT (NIM 10204054), RIZKI