THE PLANNING OF CONSTRUCTION METHODS AND MANAGEMENT OF AQUAMARINE PARK̉̉S PRIMARY BUILDING DENPASAR BALI
Aquamarine Park is a tourist area in the field of conservation of underwater wealth located in Serangan Island, Denpasar, Bali Province. This tourist place has several functions that are as a place of recreation, place of education, and place of conservation of living creature of salt air and fresh...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/23895 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Aquamarine Park is a tourist area in the field of conservation of underwater wealth located in Serangan Island, Denpasar, Bali Province. This tourist place has several functions that are as a place of recreation, place of education, and place of conservation of living creature of salt air and fresh water. In this area there are main building (marine aquarium), conservation pond, auditorium, dolphinarium, and public freshwater pool area. In the main building, necessary. Planning, development, and cost. Development plan. Planning of this construction method will be used as an option for the owner and the contractor for the interest of auction and construction in the field. <br />
<br />
<br />
<br />
The method of construction is planned to begin with preparatory work. Then work the structure under the main building consisting of foundation drill pile, pile cap, and tie beam. Top structural work of reinforced concrete structures for columns, beams, and plates and steel structures for roof frame construction. <br />
<br />
<br />
<br />
Based on project scheduling planning, the total duration of this project construction is 223 days, this duration calculation is based on two types of work ie work with machine productivity and employment with labor group productivity. In addition to the duration, from the project scheduling is also generated the critical path of the project that must be considered for the sustainability of the project is not too late. <br />
<br />
<br />
<br />
In the estimation of project costs, estimates are made from the consultant planner's view, so the resulting output is Engineer's Estimate which will be used by the owner when conducting the tender process with the contractor. Cost estimation is done by unit price analysis method in accordance with SNI of 2008 on Unit Price Analysis for Building Construction. The estimated cost of construction on Aquamarine Park's main building project is Rp 48,679,588,900; Where the estimation results include direct costs and indirect project costs. |
---|