NORMALIZATION PLANNING FOR UPPER-CITARIK RIVER BY USING HEC-RAS 4.1.0 SIMULATION
Floods caused by overflowing of Citarik river upstream through Bandung regency resulted in huge losses including of physical losses and non-physical losses. The overflowing of Citarik River was caused by the river no longer able to accommodate the flood discharge that occurs . Severe sedimentation c...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/24074 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |