#TITLE_ALTERNATIVE#

Artificial lift systems are commonly used to increase the depleted production of oil and gas and reproduce the well which no longer able to be produced naturally. Artificial lift is a way to achieve the production of oil and gas plan for depleted well. Sucker Rod Pump and Gas Lift Injection are meth...

Full description

Saved in:
Bibliographic Details
Main Author: BAGUS RAMADHANI (NIM : 12209060), SATRYO
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/24237
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:24237
spelling id-itb.:242372017-12-20T10:10:16Z#TITLE_ALTERNATIVE# BAGUS RAMADHANI (NIM : 12209060), SATRYO Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/24237 Artificial lift systems are commonly used to increase the depleted production of oil and gas and reproduce the well which no longer able to be produced naturally. Artificial lift is a way to achieve the production of oil and gas plan for depleted well. Sucker Rod Pump and Gas Lift Injection are methods commonly chosen as the solution of this problem. <br /> <br /> Way of choosing the right artificial lift method depends on some factors to achieve high efficiency of its process. The right method and well designed artificial lift will give maximum performance of oil and gas production. In this final assignment, author would like to propose an artificial lift method by combining two methods to lift heavy oil, which are Sucker Rod Pump and Gas Lift Injection. Based on the result of this study, it can be concluded that combined artificial method could decrease Sucker Rod Pump load by decreasing value of the torque to lift heavy oil. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Artificial lift systems are commonly used to increase the depleted production of oil and gas and reproduce the well which no longer able to be produced naturally. Artificial lift is a way to achieve the production of oil and gas plan for depleted well. Sucker Rod Pump and Gas Lift Injection are methods commonly chosen as the solution of this problem. <br /> <br /> Way of choosing the right artificial lift method depends on some factors to achieve high efficiency of its process. The right method and well designed artificial lift will give maximum performance of oil and gas production. In this final assignment, author would like to propose an artificial lift method by combining two methods to lift heavy oil, which are Sucker Rod Pump and Gas Lift Injection. Based on the result of this study, it can be concluded that combined artificial method could decrease Sucker Rod Pump load by decreasing value of the torque to lift heavy oil.
format Final Project
author BAGUS RAMADHANI (NIM : 12209060), SATRYO
spellingShingle BAGUS RAMADHANI (NIM : 12209060), SATRYO
#TITLE_ALTERNATIVE#
author_facet BAGUS RAMADHANI (NIM : 12209060), SATRYO
author_sort BAGUS RAMADHANI (NIM : 12209060), SATRYO
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/24237
_version_ 1822020338692653056