#TITLE_ALTERNATIVE#
Cibinong is a district which is the center government area of Bogor regency. Since the enactment of the Law Number 22 Year 1999, Cibinong district began to use its autonomy to build the area. Statistic shows that the number of residents who live in Cibinong is 384.087 people (Central Bureau of Stati...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/24260 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:24260 |
---|---|
spelling |
id-itb.:242602017-12-08T06:42:48Z#TITLE_ALTERNATIVE# DJOHARI , SENTOSA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/24260 Cibinong is a district which is the center government area of Bogor regency. Since the enactment of the Law Number 22 Year 1999, Cibinong district began to use its autonomy to build the area. Statistic shows that the number of residents who live in Cibinong is 384.087 people (Central Bureau of Statistics). With a population density of 82 people per Ha and as the center of district government it led to the need for adequate development in Cibinong District. One of the necessary development sectors is the infrastructure field, which is in the form of Cibinong Science Center. <br /> <br /> <br /> Construction will be built on a thick layer of clay. There will be 2 foundation design option which is pile and shallow with soil improvement. For improvement, after analyzing the most suitable repair methods are preloading, Prefabricated Vertical Drain and Stone Column. Preloading, will increase the effective tension on the ground and trigger the consolidation process. Then PVD will shorten the drainage path so that the pore water will be more quickly dissipated. <br /> <br /> <br /> Foundation pile with specification diameter 300 mm square and the depth of erection is 20 meter (30 meter for the tower). <br /> <br /> <br /> As for shallow foundations used foundation tread planted at a depth of 1.5m to 2m. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Cibinong is a district which is the center government area of Bogor regency. Since the enactment of the Law Number 22 Year 1999, Cibinong district began to use its autonomy to build the area. Statistic shows that the number of residents who live in Cibinong is 384.087 people (Central Bureau of Statistics). With a population density of 82 people per Ha and as the center of district government it led to the need for adequate development in Cibinong District. One of the necessary development sectors is the infrastructure field, which is in the form of Cibinong Science Center. <br />
<br />
<br />
Construction will be built on a thick layer of clay. There will be 2 foundation design option which is pile and shallow with soil improvement. For improvement, after analyzing the most suitable repair methods are preloading, Prefabricated Vertical Drain and Stone Column. Preloading, will increase the effective tension on the ground and trigger the consolidation process. Then PVD will shorten the drainage path so that the pore water will be more quickly dissipated. <br />
<br />
<br />
Foundation pile with specification diameter 300 mm square and the depth of erection is 20 meter (30 meter for the tower). <br />
<br />
<br />
As for shallow foundations used foundation tread planted at a depth of 1.5m to 2m. |
format |
Final Project |
author |
DJOHARI , SENTOSA |
spellingShingle |
DJOHARI , SENTOSA #TITLE_ALTERNATIVE# |
author_facet |
DJOHARI , SENTOSA |
author_sort |
DJOHARI , SENTOSA |
title |
#TITLE_ALTERNATIVE# |
title_short |
#TITLE_ALTERNATIVE# |
title_full |
#TITLE_ALTERNATIVE# |
title_fullStr |
#TITLE_ALTERNATIVE# |
title_full_unstemmed |
#TITLE_ALTERNATIVE# |
title_sort |
#title_alternative# |
url |
https://digilib.itb.ac.id/gdl/view/24260 |
_version_ |
1822921168147972096 |