IMPROVING AN AGGREGATE PLANNING SYSTEM: A CASE OF GARMENT INDUSTRY
The study attempts to overcome unsynchronized demand and supply in PT X production process as a result of lack in the planning system and under-capacity workers. Traditional method used in the company’s production planning and management does not provide a required strategy tocoordinate productio...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/24285 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |