REINFORCEMENT BARS INVENTORY STUDY IN GALLERY CIUMBULEUIT 2 APARTEMENT PROJECT BASED ON DYNAMIC INVENTORY MODELS.

One of the main parameters of a successful project is the capability of the management to regulate resources in a broad and detailed manner as thoroughly as possible. The means to regulate resources such as material supply is paramount to a project. The cause being that the single largest cost compo...

Full description

Saved in:
Bibliographic Details
Main Author: CHANDRU NANWANI (NIM : 15009003), STEPHANIE
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/24385
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:24385
spelling id-itb.:243852017-11-09T14:33:07ZREINFORCEMENT BARS INVENTORY STUDY IN GALLERY CIUMBULEUIT 2 APARTEMENT PROJECT BASED ON DYNAMIC INVENTORY MODELS. CHANDRU NANWANI (NIM : 15009003), STEPHANIE Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/24385 One of the main parameters of a successful project is the capability of the management to regulate resources in a broad and detailed manner as thoroughly as possible. The means to regulate resources such as material supply is paramount to a project. The cause being that the single largest cost component is materials. Considering this, choosing, ordering, delivery, and the handling of materials in the field, must be executed without fail, so that the quality and quantity of said materials are maintained. Failing to execute a good material management can result in the increase in cost during the construction. An efficient material management can result in major savings in the course of the project. This final project contains study on material supply (in this case reinforcement bars or rebars), including the comparison between the actual cost projection, to the optimum cost projection based on dynamic inventory model. Any costs that can be minimized, and how much the savings, can be viewed/projected from the dynamic inventory model. The data used in this final project is sourced from the <br /> <br /> actual Gallery Ciumbuleuit 2 Apartment project. The comparison between the optimum cost projection and the actual cost projection, using the dynamic inventory model, shows that the optimum rebar material supply cost is 5.44% cheaper or Rp. 750,000,000 cheaper than the actual costs. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description One of the main parameters of a successful project is the capability of the management to regulate resources in a broad and detailed manner as thoroughly as possible. The means to regulate resources such as material supply is paramount to a project. The cause being that the single largest cost component is materials. Considering this, choosing, ordering, delivery, and the handling of materials in the field, must be executed without fail, so that the quality and quantity of said materials are maintained. Failing to execute a good material management can result in the increase in cost during the construction. An efficient material management can result in major savings in the course of the project. This final project contains study on material supply (in this case reinforcement bars or rebars), including the comparison between the actual cost projection, to the optimum cost projection based on dynamic inventory model. Any costs that can be minimized, and how much the savings, can be viewed/projected from the dynamic inventory model. The data used in this final project is sourced from the <br /> <br /> actual Gallery Ciumbuleuit 2 Apartment project. The comparison between the optimum cost projection and the actual cost projection, using the dynamic inventory model, shows that the optimum rebar material supply cost is 5.44% cheaper or Rp. 750,000,000 cheaper than the actual costs.
format Final Project
author CHANDRU NANWANI (NIM : 15009003), STEPHANIE
spellingShingle CHANDRU NANWANI (NIM : 15009003), STEPHANIE
REINFORCEMENT BARS INVENTORY STUDY IN GALLERY CIUMBULEUIT 2 APARTEMENT PROJECT BASED ON DYNAMIC INVENTORY MODELS.
author_facet CHANDRU NANWANI (NIM : 15009003), STEPHANIE
author_sort CHANDRU NANWANI (NIM : 15009003), STEPHANIE
title REINFORCEMENT BARS INVENTORY STUDY IN GALLERY CIUMBULEUIT 2 APARTEMENT PROJECT BASED ON DYNAMIC INVENTORY MODELS.
title_short REINFORCEMENT BARS INVENTORY STUDY IN GALLERY CIUMBULEUIT 2 APARTEMENT PROJECT BASED ON DYNAMIC INVENTORY MODELS.
title_full REINFORCEMENT BARS INVENTORY STUDY IN GALLERY CIUMBULEUIT 2 APARTEMENT PROJECT BASED ON DYNAMIC INVENTORY MODELS.
title_fullStr REINFORCEMENT BARS INVENTORY STUDY IN GALLERY CIUMBULEUIT 2 APARTEMENT PROJECT BASED ON DYNAMIC INVENTORY MODELS.
title_full_unstemmed REINFORCEMENT BARS INVENTORY STUDY IN GALLERY CIUMBULEUIT 2 APARTEMENT PROJECT BASED ON DYNAMIC INVENTORY MODELS.
title_sort reinforcement bars inventory study in gallery ciumbuleuit 2 apartement project based on dynamic inventory models.
url https://digilib.itb.ac.id/gdl/view/24385
_version_ 1822921207547166720