DETERMINING MATERIALS REQUIREMENT PLANNING OF REMANUFACTURED DUMP TRUCK AT X COMPANY

PT X is a heavy equipment manufacturing company with has remanufacturing business sector. One of the products which is remanufactured by PT X is dump truck engine. Besides engine, PT X also provides remanufacturing in the form of subcomponents such as turbo charger and fuel pump. The engines and sub...

Full description

Saved in:
Bibliographic Details
Main Author: YOTANTI - NIM 13413051 , TISA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/24540
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:24540
spelling id-itb.:245402017-09-27T15:05:44ZDETERMINING MATERIALS REQUIREMENT PLANNING OF REMANUFACTURED DUMP TRUCK AT X COMPANY YOTANTI - NIM 13413051 , TISA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/24540 PT X is a heavy equipment manufacturing company with has remanufacturing business sector. One of the products which is remanufactured by PT X is dump truck engine. Besides engine, PT X also provides remanufacturing in the form of subcomponents such as turbo charger and fuel pump. The engines and subcomponents received by PT X (called core) come from different regions such as Belgium, America, Australia and South Africa. The remanufacturing product produced by PT X is composed of new and old parts that have been manufactured. Some spare parts which conditions do not conform for machining should be replaced with new parts. However, since new spare parts suppliers are abroad, the lead time is very long (3 months). As a result, number of ordered parts must be determined long before PT X sees the real condition of the used product. This causes the company to make an assessment of the number of replacement parts. So far, the company uses average historical replacement and is equipped with expert judgment in determining the quantity order. However, companies often experience deficiencies that can reach 7 out of 10 orders. This has an impact on emergency orders with the price of goods rising by 800%. Therefore, the company needs to think about how to determine the best order quantity. In this research used Material Requirement Planning (MRP) approach which is commonly found in manufacturing system for determining quantity order. However, in order to overcome the problem of uncertain conditions of parts received by PT X then it is modified with the application of replacement ratio in MRP. The replacement ratio is calculated based on the stratified number of replacement per machine's origin region. In addition, the best lot size is also determined. Based on this research, the best material planning method is obtained by calculating the average replacement ratio per region. The best order size determination method is done by Silver-Meal method. The total cost savings of the three average spare parts of Rp 8,861,314 were reduced by 55% of the total current cost. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT X is a heavy equipment manufacturing company with has remanufacturing business sector. One of the products which is remanufactured by PT X is dump truck engine. Besides engine, PT X also provides remanufacturing in the form of subcomponents such as turbo charger and fuel pump. The engines and subcomponents received by PT X (called core) come from different regions such as Belgium, America, Australia and South Africa. The remanufacturing product produced by PT X is composed of new and old parts that have been manufactured. Some spare parts which conditions do not conform for machining should be replaced with new parts. However, since new spare parts suppliers are abroad, the lead time is very long (3 months). As a result, number of ordered parts must be determined long before PT X sees the real condition of the used product. This causes the company to make an assessment of the number of replacement parts. So far, the company uses average historical replacement and is equipped with expert judgment in determining the quantity order. However, companies often experience deficiencies that can reach 7 out of 10 orders. This has an impact on emergency orders with the price of goods rising by 800%. Therefore, the company needs to think about how to determine the best order quantity. In this research used Material Requirement Planning (MRP) approach which is commonly found in manufacturing system for determining quantity order. However, in order to overcome the problem of uncertain conditions of parts received by PT X then it is modified with the application of replacement ratio in MRP. The replacement ratio is calculated based on the stratified number of replacement per machine's origin region. In addition, the best lot size is also determined. Based on this research, the best material planning method is obtained by calculating the average replacement ratio per region. The best order size determination method is done by Silver-Meal method. The total cost savings of the three average spare parts of Rp 8,861,314 were reduced by 55% of the total current cost.
format Final Project
author YOTANTI - NIM 13413051 , TISA
spellingShingle YOTANTI - NIM 13413051 , TISA
DETERMINING MATERIALS REQUIREMENT PLANNING OF REMANUFACTURED DUMP TRUCK AT X COMPANY
author_facet YOTANTI - NIM 13413051 , TISA
author_sort YOTANTI - NIM 13413051 , TISA
title DETERMINING MATERIALS REQUIREMENT PLANNING OF REMANUFACTURED DUMP TRUCK AT X COMPANY
title_short DETERMINING MATERIALS REQUIREMENT PLANNING OF REMANUFACTURED DUMP TRUCK AT X COMPANY
title_full DETERMINING MATERIALS REQUIREMENT PLANNING OF REMANUFACTURED DUMP TRUCK AT X COMPANY
title_fullStr DETERMINING MATERIALS REQUIREMENT PLANNING OF REMANUFACTURED DUMP TRUCK AT X COMPANY
title_full_unstemmed DETERMINING MATERIALS REQUIREMENT PLANNING OF REMANUFACTURED DUMP TRUCK AT X COMPANY
title_sort determining materials requirement planning of remanufactured dump truck at x company
url https://digilib.itb.ac.id/gdl/view/24540
_version_ 1822921262456897536