#TITLE_ALTERNATIVE#

Many of Indonesian oil fields are brown fields. Field X has started to produce oil in 1937 and has started water flooding program in 1992. This field reached a high RF in 2012 with the value of 38.88%. Then this company used it’s reservoir data with a commercial simulator to forecast oil producti...

Full description

Saved in:
Bibliographic Details
Main Author: HM (NIM : 12209097), YUDHA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/24814
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:Many of Indonesian oil fields are brown fields. Field X has started to produce oil in 1937 and has started water flooding program in 1992. This field reached a high RF in 2012 with the value of 38.88%. Then this company used it’s reservoir data with a commercial simulator to forecast oil production until early 2035where it showed an increase in RF with the value of almost 52%. In this paper, the writers try to increase this value by using simulation of the field. The writers optimize and improve production and injection well scheme so it can reach a higher RF. <br /> <br /> The purpose of this paper is to optimize production scheme and injection scheme so it can achieve higher RF than company’s design. This optimization schme is also hoped to be used on other fields in Indonesia to get more oil production at the same time. This scheme optimization method is successful to increase recoverable factor from 52% to 54.8%.