AUTOMATIC LOADER EQUIPMENT PRODUCTIVITY IMPROVEMENT IN UNDERGROUND DOZ MINING OPERATION PT FREEPORT INDONESIA
Grasberg open pit mine production will gradually slow down and stopped in 2018. PT. Freeport Indonesia <br /> <br /> (PTFI) initiating Grasberg Transition program as a part of the long-term strategy on shifting its operation <br /> <br /> model from open pit mine to the under...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/24846 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Grasberg open pit mine production will gradually slow down and stopped in 2018. PT. Freeport Indonesia <br />
<br />
(PTFI) initiating Grasberg Transition program as a part of the long-term strategy on shifting its operation <br />
<br />
model from open pit mine to the underground mine operation. During transition period, all underground <br />
<br />
mines expected to achieve its production target to back up shortcoming of ore from Grasberg mine (currently <br />
<br />
contributes to 70% of total PTFI production). In 2016, Underground DOZ mine (UG DOZ) planned to <br />
<br />
contribute for 12%. However, the production target was unachieved with average of variance 2.15% (5,379 <br />
<br />
tons per day). It is a serious condition for PTFI, as the decrease of production will potentially lead to the <br />
<br />
deficit of ore during transition period. <br />
<br />
<br />
One of the proposed initiatives of above problem is analysis and study of Automatic Loader equipment as the <br />
<br />
key equipment in UG DOZ operation. The study conducted by analyzing equipment usage hours to measure <br />
<br />
current effectiveness of the Automatic Loader operation through data driven analysis, identifying issues and <br />
<br />
inefficiency, root causes analysis from the aspects of people, process and technology. The main goal is to <br />
<br />
provide the best recommendation solutions to improve productivity of Automatic Loader equipment in UG <br />
<br />
DOZ and identify other improvement opportunities to maintain production target achievement the future. <br />
<br />
<br />
The methodology used is Six Sigma with DMAIC as a tool that most often used within a simple performance <br />
<br />
model improvement of existing business process. Root cause and solution analysis come up with eight <br />
<br />
proposed initiatives, communication & coordination improvement, workflow & assignment system <br />
<br />
implementation, competency training, reward & punishment system, downtime analysis & improvement, <br />
<br />
utilize Minestar capability, utilize MST tracking system and add loader equipment. <br />
<br />
<br />
The implementation divided into three phases with the estimated time execution in the three quarters <br />
<br />
involving several parties such us Production Team, Engineering Team, MIS, etc. It is estimated will <br />
<br />
increasing productivity of Automatic Loader equipment through reduction of unproductive hour usage up to <br />
<br />
14.16% from overall unproductive hours or 8.64% from total production hours during 2016. Analysis result <br />
<br />
shows that unachieved production target in 2016 potentially resolved through the proposed improvement <br />
<br />
initiatives with additional ore from reduction of the unproductive hours reaches 5,387.12 tons per day or <br />
<br />
1,966,299.30 tons annually (equivalent to $ 26,387,737). <br />
<br />
<br />
With the estimated cost requirement is $660.000, the net benefit will be $ 25,727,737. It is bigger than the <br />
<br />
production loss caused by unachieved production target during 2016 in Underground DOZ operation that <br />
<br />
reached $ 26,626,094. <br />
|
---|