#TITLE_ALTERNATIVE#

<p align="justify"> In Indonesia, fisheries sector has played a significant role in economic development. The nation’s economic waters2 are 5.8 million km2 with the estimated 6.3 million tons of sustainable marine resources potential of wide variety. In 1991, total fish catches am...

Full description

Saved in:
Bibliographic Details
Main Author: ACHMAD RYAN FERRY (NIM: 15511022), A.
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/24878
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:<p align="justify"> In Indonesia, fisheries sector has played a significant role in economic development. The nation’s economic waters2 are 5.8 million km2 with the estimated 6.3 million tons of sustainable marine resources potential of wide variety. In 1991, total fish catches amounted to 3.4 million tons, which was the world’s ninth largest. However, due to the underdevelopment of fisheries infrastructures and other factors, utilization of marine resources has not been optimal. The development of Jakarta Fishing Port (JFP) started in late 1970s. Phases I and II of the JFP project funded by ODA loan developed basic port infrastructures and some fisheries-related facilities such as an auction hall for fish supply to Jakarta City and backland for fish processing industry. The Phase II project completed in 1984, and the port started operation in the same year. In this development, will be built a quaywall port. For its construction, it takes the right management and construction methods to be solved efficiently and economics. The purpose of this final project is to determine the planning by making Work Breakdown Structures (WBS), work volume, productivity, construction method with completion time of 11 months, and determine total cost of Jakarta Fishing Port. This port will serve fishing vessels with the size 51 - 100 GT. This work includes piles, beams, floor plates, fenders, and mooring bitts. The construction method used for the work in the field, with the total cost calculation for this structure is Rp 38.863.279.319. <p align="justify">