JETTY PLANNING FOR SEDIMENT CONTROL IN CILETUH ESTUARY, SUKABUMI REGENCY

<p align="justify">Fishermen around Ciletuh estuary having difficult times due to their lack of fish cathments. This happens because of sedimentation on Ciletuh estuary, causing the fishermen unable to moor their boats. Sedimentations in Ciletuh estuary is the accumulation of the sed...

Full description

Saved in:
Bibliographic Details
Main Author: MAULANA SUTRISNA - NIM : 15813043 , AFRIZAL
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/25090
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:25090
spelling id-itb.:250902018-06-26T14:25:29ZJETTY PLANNING FOR SEDIMENT CONTROL IN CILETUH ESTUARY, SUKABUMI REGENCY MAULANA SUTRISNA - NIM : 15813043 , AFRIZAL Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/25090 <p align="justify">Fishermen around Ciletuh estuary having difficult times due to their lack of fish cathments. This happens because of sedimentation on Ciletuh estuary, causing the fishermen unable to moor their boats. Sedimentations in Ciletuh estuary is the accumulation of the sediment transport from Ciletuh river. This can lead to many problems in the estuary and the surrounding. This is confirmed from observations in the field that in Ciletuh Bay there has been a very worrying sedimentation. Therefore, to overcome these problems, it is necessary to do the analysis related to river flow, sedimentation, and also the effect of tides and waves in Ciletuh Bay. So that can be made a proper estuary protection, so that the fishermen can back to their normal activities. The sedimentation modeling is performed by using Delft3D with 3 conditions: wet season, dry season and flood condition. Concluded that the highest sedimentation happens when flood condition is in return periode of 2 years, with the value of sedimentation reaching 2 meters high. The chosen alternative is to build two jetty along 700 meters on both sides of Ciletuh estuary. Planning of the jetty includes calculation of the amount and thickness of the protection stone, elevation and width of the top, toe protection, calculation of the soil bearing capacity, and the cost analysis. The cost required to build these jetty in Ciletuh estuary is about 23,4 Billion rupiah. <p align="justify"> <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description <p align="justify">Fishermen around Ciletuh estuary having difficult times due to their lack of fish cathments. This happens because of sedimentation on Ciletuh estuary, causing the fishermen unable to moor their boats. Sedimentations in Ciletuh estuary is the accumulation of the sediment transport from Ciletuh river. This can lead to many problems in the estuary and the surrounding. This is confirmed from observations in the field that in Ciletuh Bay there has been a very worrying sedimentation. Therefore, to overcome these problems, it is necessary to do the analysis related to river flow, sedimentation, and also the effect of tides and waves in Ciletuh Bay. So that can be made a proper estuary protection, so that the fishermen can back to their normal activities. The sedimentation modeling is performed by using Delft3D with 3 conditions: wet season, dry season and flood condition. Concluded that the highest sedimentation happens when flood condition is in return periode of 2 years, with the value of sedimentation reaching 2 meters high. The chosen alternative is to build two jetty along 700 meters on both sides of Ciletuh estuary. Planning of the jetty includes calculation of the amount and thickness of the protection stone, elevation and width of the top, toe protection, calculation of the soil bearing capacity, and the cost analysis. The cost required to build these jetty in Ciletuh estuary is about 23,4 Billion rupiah. <p align="justify"> <br />
format Final Project
author MAULANA SUTRISNA - NIM : 15813043 , AFRIZAL
spellingShingle MAULANA SUTRISNA - NIM : 15813043 , AFRIZAL
JETTY PLANNING FOR SEDIMENT CONTROL IN CILETUH ESTUARY, SUKABUMI REGENCY
author_facet MAULANA SUTRISNA - NIM : 15813043 , AFRIZAL
author_sort MAULANA SUTRISNA - NIM : 15813043 , AFRIZAL
title JETTY PLANNING FOR SEDIMENT CONTROL IN CILETUH ESTUARY, SUKABUMI REGENCY
title_short JETTY PLANNING FOR SEDIMENT CONTROL IN CILETUH ESTUARY, SUKABUMI REGENCY
title_full JETTY PLANNING FOR SEDIMENT CONTROL IN CILETUH ESTUARY, SUKABUMI REGENCY
title_fullStr JETTY PLANNING FOR SEDIMENT CONTROL IN CILETUH ESTUARY, SUKABUMI REGENCY
title_full_unstemmed JETTY PLANNING FOR SEDIMENT CONTROL IN CILETUH ESTUARY, SUKABUMI REGENCY
title_sort jetty planning for sediment control in ciletuh estuary, sukabumi regency
url https://digilib.itb.ac.id/gdl/view/25090
_version_ 1821844875219304448