OPTIMIZATION OF DEVELOPMENT PLAN OF THE LIWA CITY WATER SUPPLY SYSTEM BY MEANS OF LINEAR PROGRAM MODELING

Scarcity of funds and others resources are typical problems in a small scale water supply system, as happened in Liwa City. The scarcity causes the inability of local water supply company (PDAM) to runs its service activities in healthy way, particularly in its financial aspect. Therefore, optimizat...

Full description

Saved in:
Bibliographic Details
Main Author: RIANTO (NIM : 25713305), AGUS
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/25144
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:25144
spelling id-itb.:251442018-08-15T13:29:19ZOPTIMIZATION OF DEVELOPMENT PLAN OF THE LIWA CITY WATER SUPPLY SYSTEM BY MEANS OF LINEAR PROGRAM MODELING RIANTO (NIM : 25713305), AGUS Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/25144 Scarcity of funds and others resources are typical problems in a small scale water supply system, as happened in Liwa City. The scarcity causes the inability of local water supply company (PDAM) to runs its service activities in healthy way, particularly in its financial aspect. Therefore, optimization of all available resources is required in order to achieve maximum revenue. Linear program is a tool that could optimizes an operational activity which its objective, variables, and constraints can be identified. Whereas development of water supply system can be considered as a business activity that satisfies the criterion, and therefore can be modeled in a linear program. The linear program developed in this research is an optimization model for multi-period activity planning during the projection years of 2017 - 2031. The modeling generates a linear program with 25 decision variables and 33 constraint functions. Optimization result for the initial model (Scenario I) recommends investments for 1,798 units of new house connection, 3,820 units of water meter, 7,653 meters of distribution pipeline during the projection years. Optimum resources allocation and phasing strategy allow revenue with NPV Rp1,251,017,645.00. Simulations are also be conducted to know effect of policy change to the optimization results. Scenario II, namely simulation by changing the tariff plan policy, recommends investments for 1,593 units of new house connection, 3,820 units of water meter, and 7,653 meters of distribution pipeline with estimated optimum NPV Rp661,692,354.00. Scenario III, namelu simulation by eliminating the target of distribution pipeline extension, recommends investments for 3,289 unit of new house connection and 3,820 units of water meter with estimated optimum NPV Rp6,689,779,116.00. Meanwhile cenario IV, namely simulation by liberating PDAM from payment obligation to local government's revenue, recommend investments for 6,118 units of new house Connection, 3,820 units of water meter, and 7,653 meters of distribution pipeline with estimated optimum NPV Rp17,228,388,803.00. The best optimum scenario is recommended for Scenario IV. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Scarcity of funds and others resources are typical problems in a small scale water supply system, as happened in Liwa City. The scarcity causes the inability of local water supply company (PDAM) to runs its service activities in healthy way, particularly in its financial aspect. Therefore, optimization of all available resources is required in order to achieve maximum revenue. Linear program is a tool that could optimizes an operational activity which its objective, variables, and constraints can be identified. Whereas development of water supply system can be considered as a business activity that satisfies the criterion, and therefore can be modeled in a linear program. The linear program developed in this research is an optimization model for multi-period activity planning during the projection years of 2017 - 2031. The modeling generates a linear program with 25 decision variables and 33 constraint functions. Optimization result for the initial model (Scenario I) recommends investments for 1,798 units of new house connection, 3,820 units of water meter, 7,653 meters of distribution pipeline during the projection years. Optimum resources allocation and phasing strategy allow revenue with NPV Rp1,251,017,645.00. Simulations are also be conducted to know effect of policy change to the optimization results. Scenario II, namely simulation by changing the tariff plan policy, recommends investments for 1,593 units of new house connection, 3,820 units of water meter, and 7,653 meters of distribution pipeline with estimated optimum NPV Rp661,692,354.00. Scenario III, namelu simulation by eliminating the target of distribution pipeline extension, recommends investments for 3,289 unit of new house connection and 3,820 units of water meter with estimated optimum NPV Rp6,689,779,116.00. Meanwhile cenario IV, namely simulation by liberating PDAM from payment obligation to local government's revenue, recommend investments for 6,118 units of new house Connection, 3,820 units of water meter, and 7,653 meters of distribution pipeline with estimated optimum NPV Rp17,228,388,803.00. The best optimum scenario is recommended for Scenario IV.
format Theses
author RIANTO (NIM : 25713305), AGUS
spellingShingle RIANTO (NIM : 25713305), AGUS
OPTIMIZATION OF DEVELOPMENT PLAN OF THE LIWA CITY WATER SUPPLY SYSTEM BY MEANS OF LINEAR PROGRAM MODELING
author_facet RIANTO (NIM : 25713305), AGUS
author_sort RIANTO (NIM : 25713305), AGUS
title OPTIMIZATION OF DEVELOPMENT PLAN OF THE LIWA CITY WATER SUPPLY SYSTEM BY MEANS OF LINEAR PROGRAM MODELING
title_short OPTIMIZATION OF DEVELOPMENT PLAN OF THE LIWA CITY WATER SUPPLY SYSTEM BY MEANS OF LINEAR PROGRAM MODELING
title_full OPTIMIZATION OF DEVELOPMENT PLAN OF THE LIWA CITY WATER SUPPLY SYSTEM BY MEANS OF LINEAR PROGRAM MODELING
title_fullStr OPTIMIZATION OF DEVELOPMENT PLAN OF THE LIWA CITY WATER SUPPLY SYSTEM BY MEANS OF LINEAR PROGRAM MODELING
title_full_unstemmed OPTIMIZATION OF DEVELOPMENT PLAN OF THE LIWA CITY WATER SUPPLY SYSTEM BY MEANS OF LINEAR PROGRAM MODELING
title_sort optimization of development plan of the liwa city water supply system by means of linear program modeling
url https://digilib.itb.ac.id/gdl/view/25144
_version_ 1822921460292780032