DESIGN OF AJI RADEN DAM BALIKPAPAN CITY, EAST KALIMANTAN FOR FULFILLING RAW WATER SUPPLY NEED
One of problems relate to water resources in Balikpapan City is the raw water supply <br /> <br /> deficit which hit the total of 105 l/s. The construction of Aji Raden Small Dams as raw <br /> <br /> water reservoir was expected to support the city against raw water supply c...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/25692 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:25692 |
---|---|
spelling |
id-itb.:256922018-03-15T14:36:29ZDESIGN OF AJI RADEN DAM BALIKPAPAN CITY, EAST KALIMANTAN FOR FULFILLING RAW WATER SUPPLY NEED Prianggara ( NIM : 15813027), Antariksa Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/25692 One of problems relate to water resources in Balikpapan City is the raw water supply <br /> <br /> deficit which hit the total of 105 l/s. The construction of Aji Raden Small Dams as raw <br /> <br /> water reservoir was expected to support the city against raw water supply crisis <br /> <br /> especially in East Balikpapan region. Aji Raden Dam is a homogenous earthfill dam <br /> <br /> with an ogee overflow spillway. This paper mainly discusses about the steps in <br /> <br /> designing Aji Raden Dam which consist of , (a) hydrology analysis to obtain the value <br /> <br /> of flood discharge and the dependable discharge, (b) dead storage analysis by USLE <br /> <br /> method, (c) reservoir operation optimization, (d) hydraulic and structure planning of <br /> <br /> spillway crest, (e) hydraulic and dimension planning of spillway channel, (f) designing <br /> <br /> the body of dam, (g) budget planning for construction. Based on analysis there are <br /> <br /> several conclusions, those are (1) the dam has 1281531 m3 of total storage with <br /> <br /> 531067 m3 of effective storage, and 240463 m3 of dead storage, (2) elevation of <br /> <br /> normal water level is on EL +16.5 m, elevation of dead strorage level is on EL +14.35 <br /> <br /> m, and the full reservoir level is on EL +18 m, (3) based on reservoir release <br /> <br /> optimization analysis, the reservoir has the total release of 64.85 l/s in dry period to <br /> <br /> 205 l/s in wet period, (4) the body of dam is planned to be earthfill homogenous type <br /> <br /> with 1:3 upstream slope and 1:2.5 downstream slope, (5) the spillway is planned to <br /> <br /> have the flood discharge capacity of Q0.5 PMF = 83 m3/s with crest elevation on EL <br /> <br /> +16.5 m and total head above the crest H0 = 1.5 m. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
One of problems relate to water resources in Balikpapan City is the raw water supply <br />
<br />
deficit which hit the total of 105 l/s. The construction of Aji Raden Small Dams as raw <br />
<br />
water reservoir was expected to support the city against raw water supply crisis <br />
<br />
especially in East Balikpapan region. Aji Raden Dam is a homogenous earthfill dam <br />
<br />
with an ogee overflow spillway. This paper mainly discusses about the steps in <br />
<br />
designing Aji Raden Dam which consist of , (a) hydrology analysis to obtain the value <br />
<br />
of flood discharge and the dependable discharge, (b) dead storage analysis by USLE <br />
<br />
method, (c) reservoir operation optimization, (d) hydraulic and structure planning of <br />
<br />
spillway crest, (e) hydraulic and dimension planning of spillway channel, (f) designing <br />
<br />
the body of dam, (g) budget planning for construction. Based on analysis there are <br />
<br />
several conclusions, those are (1) the dam has 1281531 m3 of total storage with <br />
<br />
531067 m3 of effective storage, and 240463 m3 of dead storage, (2) elevation of <br />
<br />
normal water level is on EL +16.5 m, elevation of dead strorage level is on EL +14.35 <br />
<br />
m, and the full reservoir level is on EL +18 m, (3) based on reservoir release <br />
<br />
optimization analysis, the reservoir has the total release of 64.85 l/s in dry period to <br />
<br />
205 l/s in wet period, (4) the body of dam is planned to be earthfill homogenous type <br />
<br />
with 1:3 upstream slope and 1:2.5 downstream slope, (5) the spillway is planned to <br />
<br />
have the flood discharge capacity of Q0.5 PMF = 83 m3/s with crest elevation on EL <br />
<br />
+16.5 m and total head above the crest H0 = 1.5 m. |
format |
Final Project |
author |
Prianggara ( NIM : 15813027), Antariksa |
spellingShingle |
Prianggara ( NIM : 15813027), Antariksa DESIGN OF AJI RADEN DAM BALIKPAPAN CITY, EAST KALIMANTAN FOR FULFILLING RAW WATER SUPPLY NEED |
author_facet |
Prianggara ( NIM : 15813027), Antariksa |
author_sort |
Prianggara ( NIM : 15813027), Antariksa |
title |
DESIGN OF AJI RADEN DAM BALIKPAPAN CITY, EAST KALIMANTAN FOR FULFILLING RAW WATER SUPPLY NEED |
title_short |
DESIGN OF AJI RADEN DAM BALIKPAPAN CITY, EAST KALIMANTAN FOR FULFILLING RAW WATER SUPPLY NEED |
title_full |
DESIGN OF AJI RADEN DAM BALIKPAPAN CITY, EAST KALIMANTAN FOR FULFILLING RAW WATER SUPPLY NEED |
title_fullStr |
DESIGN OF AJI RADEN DAM BALIKPAPAN CITY, EAST KALIMANTAN FOR FULFILLING RAW WATER SUPPLY NEED |
title_full_unstemmed |
DESIGN OF AJI RADEN DAM BALIKPAPAN CITY, EAST KALIMANTAN FOR FULFILLING RAW WATER SUPPLY NEED |
title_sort |
design of aji raden dam balikpapan city, east kalimantan for fulfilling raw water supply need |
url |
https://digilib.itb.ac.id/gdl/view/25692 |
_version_ |
1822921639121125376 |