CAPITAL BUDGETING FOR CN235 NG DEVELOPMENT PROGRAM
Indonesia is an archipelago that prohibits many modes of transportation between islands, land, <br /> <br /> sea, and air. At present air mode, fixed-wing aircraft will be the leading alternative as intro and <br /> <br /> inter-port connectivity in the economy that connects...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/25778 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Indonesia is an archipelago that prohibits many modes of transportation between islands, land, <br />
<br />
sea, and air. At present air mode, fixed-wing aircraft will be the leading alternative as intro and <br />
<br />
inter-port connectivity in the economy that connects between airports that have a short runway <br />
<br />
with the specifications of Short Take-off and Landing (STOL). This aircraft is the leading <br />
<br />
alternative in completing the inter-island or city mobilization that cannot be traversed by sea or <br />
<br />
land transportation, especially in areas that may include pioneers. <br />
<br />
PT Dirgantara Indonesia (Persero) does not have sufficient capital to develop the CN235 NG <br />
<br />
program. Therefore it is necessary to conduct a Feasibility Study from this program. In this study <br />
<br />
only regarding financial aspects. Financial analysis performed in this study aims to provide <br />
<br />
confidence to debtor to provide capital for the development of CN235 NG products. Through <br />
<br />
sensitivity analysis, it is seen that the variables that most influence the results so that a simulation <br />
<br />
of 3 alternatives is carried out. Options that provide the best results will be recommended to the <br />
<br />
company as part of the CN235 NG development program business plan. To eliminate risks that <br />
<br />
might occur in the development of the CN235 NG program, risk analysis has been carried out. <br />
<br />
Stages in the risk analysis starting from the identification of possible risks and accompanied by <br />
<br />
mitigation so that the running program can generate profits for a sustainable company. |
---|