ALTERNATIF PENYEIMBANG STOK KARBON DAN NILAI EKONOMINYA UNTUK PENGGUNAAN KAWASAN HUTAN STUDI KASUS: PT. PERTAMINA GEOTHERMAL ENERGY (PGE)/ STAR ENERGY GEOTHERMAL WAYANG WINDU LIMITED (SEGWWL) DI KABUPATEN BANDUNG
<p align="justify">The intended use of forest areas by PT. PGE / SEGWWL for geothermal exploitation of ± <br /> <br /> 78,31 ha in Bandung regency, was expected release carbon stored as biomass. PLTP is a strategic national initiative, so as to support the GHG emis...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/25793 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | <p align="justify">The intended use of forest areas by PT. PGE / SEGWWL for geothermal exploitation of ± <br />
<br />
78,31 ha in Bandung regency, was expected release carbon stored as biomass. PLTP is a strategic national initiative, so as to support the GHG emission reduction policies necessary to study alternative carbon stock balancer. Sampling methods without harvesting (Non-destructive sampling) and using allometric equations from previous studies were used for calculation of carbon release and carbon sequestration potential. <br />
<br />
Analytic Hierarchy Process (AHP) was used to select the best alternative carbon stock balancer. Benefit Cost Analysis was used to economic valuation. The results of the research showed that estimate carbon release from forest area use plan is equal to 11.001,51 tons C. For balance, reforestation prospective land compensation was <br />
<br />
expected to sequester carbon by 5.025,37 tons C yr-1. Shortage of carbon equivalency of 5.976,14 tons C yr-1 can be filled with 3 alternative building private forests are 1) Jatiputih (Gmelina arborea Roxb) area of 49,55 ha, 2) Mindi (Melia azedarach L) covering an area of 92,99 ha, and 3) Eukaliptus (Eucalyptus Pellita F. Muell) covering an area of 86,50 ha. The best alternative selected using AHP method was to built a <br />
<br />
private forest of Jatiputih (Gmelina arborea Roxb). Development of private forests of Jatiputih (Gmelina arborea Roxb) covering an area of 49,55 ha has NPV of Rp. 4.295 billion for the project life of 8 years with discount factor of 10 %.<p align="justify"> |
---|