#TITLE_ALTERNATIVE#
The development strategy of gas reservoir supported by an active bottom-water aquifer is essential and requires complete attention. Water inflow may cease production of gas wells, leaving a significant amount of gas in the reservoir. One of the most promising technique to enhance gas recovery is the...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/26193 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:26193 |
---|---|
spelling |
id-itb.:261932018-05-16T08:10:23Z#TITLE_ALTERNATIVE# HARJA (NIM : 12212095), CANDRA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/26193 The development strategy of gas reservoir supported by an active bottom-water aquifer is essential and requires complete attention. Water inflow may cease production of gas wells, leaving a significant amount of gas in the reservoir. One of the most promising technique to enhance gas recovery is the co-production technique. This technique includes dual completion with an isolating packer at the bottom completion. The increased recovery is attributed to a reservoir response much similar to a depletion-drive since reservoir pressure is reduced due to water production, therefore more gas is produced by gas expansion. <br /> <br /> This paper attempts to describe and evaluate potential of associated production technology. Simulation studies were conducted, utilizing numerical simulator to develop the model and investigate recovery optimization by co-production. Sensitivity analyses are carried on define optimum rate for both completions and also the schedule of co-production. It is determined that the water production rate needed to optimize recovery increases over time, and that accelerating production rate causes the optimum co-production rate to increase even faster over time. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
The development strategy of gas reservoir supported by an active bottom-water aquifer is essential and requires complete attention. Water inflow may cease production of gas wells, leaving a significant amount of gas in the reservoir. One of the most promising technique to enhance gas recovery is the co-production technique. This technique includes dual completion with an isolating packer at the bottom completion. The increased recovery is attributed to a reservoir response much similar to a depletion-drive since reservoir pressure is reduced due to water production, therefore more gas is produced by gas expansion. <br />
<br />
This paper attempts to describe and evaluate potential of associated production technology. Simulation studies were conducted, utilizing numerical simulator to develop the model and investigate recovery optimization by co-production. Sensitivity analyses are carried on define optimum rate for both completions and also the schedule of co-production. It is determined that the water production rate needed to optimize recovery increases over time, and that accelerating production rate causes the optimum co-production rate to increase even faster over time. |
format |
Final Project |
author |
HARJA (NIM : 12212095), CANDRA |
spellingShingle |
HARJA (NIM : 12212095), CANDRA #TITLE_ALTERNATIVE# |
author_facet |
HARJA (NIM : 12212095), CANDRA |
author_sort |
HARJA (NIM : 12212095), CANDRA |
title |
#TITLE_ALTERNATIVE# |
title_short |
#TITLE_ALTERNATIVE# |
title_full |
#TITLE_ALTERNATIVE# |
title_fullStr |
#TITLE_ALTERNATIVE# |
title_full_unstemmed |
#TITLE_ALTERNATIVE# |
title_sort |
#title_alternative# |
url |
https://digilib.itb.ac.id/gdl/view/26193 |
_version_ |
1822020937314205696 |