#TITLE_ALTERNATIVE#

Optimizing production is no longer an option, nowadays, it is a necessity. The wells have to produce longer and better than ever before in order to influence projects attractiveness. However, the process to define variables such as well placement, number and type of wells, well production and inject...

Full description

Saved in:
Bibliographic Details
Main Author: DION SALAM (NIM : 12212031), DAMIAN
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/26352
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia