USULAN DESAIN BARU SISTEM MANAJEMEN KINERJA MENGGUNAKAN KERANGKA INTEGRATED PERFORMANCE MANAGEMENT SYSTEM (IPMS) UNTUK DIVISI SERVIS DI PT UNITED TRACTORS TBK
PT United Tractors Tbk has three main business: Construction Machinery (Heavy Equipment Distribution), Mining Contractor, and Mining Business. The three main businesses are managed through two divisions, namely the product division and the services division. The product division relates to the sales...
Saved in:
Main Author: | BOBY WAHYU GUNARSO (NIM : 291 15 139), DAMIANUS |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/26353 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: BOBY WAHYU GUNARSO , DAMIANUS -
PENERAPAN PROSEDUR PENAGIHAN PIUTANG JASA SERVIS DI DIVISI
BILLING SERVIS PADA AUTO 2000 (TOYOTA)
CABANG HR. MUHAMMAD
SURABAYA
by: NADIRRIADI RAMADHIAN, 151410613086
Published: (2017) -
ANALYZING POTENTIAL IMPLEMENTATION OF SUSTAINABILITY LINKED LOAN IN PT UNITED TRACTORS TBK
by: Hafizh Alfath, Muhammad -
Laporan Magang MBKM PT. United Tractors TBK EHS Management System Improvement
by: Febrianita Rizky Rahmandani, -
Published: (2023) -
DESAIN SPRUE PADA GIGI TIRUAN KERANGKA LOGAM
by: YUNI ANDRIANTO, 021310113019
Published: (2016)