DETAILED DESIGN OF CONSTRUCTION METHOD, SCHEDULING, AND CONSTRUCTION COST ESTIMATION OF AQUAMARINE PARK PROJECT, PULAU SERANGAN, BALI

<p align="justify">Aquamarine Park, Turtle Island, is a tourism spot that is built for entertainment, education, and conservation. Located in Jl. Pantai Serangan, Pulau Serangan, Denpasar Selatan, Bali, the project has a vast empty land with the size of 5.7 hectare. Aquamarine Projec...

Full description

Saved in:
Bibliographic Details
Main Author: YEODA - NIM: 15014033, DANIEL
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/26370
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:26370
spelling id-itb.:263702018-06-25T09:34:25ZDETAILED DESIGN OF CONSTRUCTION METHOD, SCHEDULING, AND CONSTRUCTION COST ESTIMATION OF AQUAMARINE PARK PROJECT, PULAU SERANGAN, BALI YEODA - NIM: 15014033, DANIEL Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/26370 <p align="justify">Aquamarine Park, Turtle Island, is a tourism spot that is built for entertainment, education, and conservation. Located in Jl. Pantai Serangan, Pulau Serangan, Denpasar Selatan, Bali, the project has a vast empty land with the size of 5.7 hectare. Aquamarine Project has some building components, but what to be dicussed in this thesis writing is the main building, Dolphinarium, and the drainage system. This thesis is focused on the construction project management aspect which includes construction method, productivity calculation, work duration, scheduling, and construction cost estimation.<br /> <br /> The construction method includes the method for the driven pile foundation, column, beam, slab, shearwall, and roof of the main building. For Dolphinarium, the method includes diaphragm wall, excavation, dewatering, anchoring, bored pile, and slab casting. For drainage system, the method includes drainage and detention pond.<br /> <br /> Aquamarine Park project starts on January 2nd, 2019 and ends on December 13th, 2019. The duration of the project is 281 days. Scheduling is done with the bar chart method and PDM. The total project cost estimation is Rp 63,270,319,051. <p align="justify"> <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description <p align="justify">Aquamarine Park, Turtle Island, is a tourism spot that is built for entertainment, education, and conservation. Located in Jl. Pantai Serangan, Pulau Serangan, Denpasar Selatan, Bali, the project has a vast empty land with the size of 5.7 hectare. Aquamarine Project has some building components, but what to be dicussed in this thesis writing is the main building, Dolphinarium, and the drainage system. This thesis is focused on the construction project management aspect which includes construction method, productivity calculation, work duration, scheduling, and construction cost estimation.<br /> <br /> The construction method includes the method for the driven pile foundation, column, beam, slab, shearwall, and roof of the main building. For Dolphinarium, the method includes diaphragm wall, excavation, dewatering, anchoring, bored pile, and slab casting. For drainage system, the method includes drainage and detention pond.<br /> <br /> Aquamarine Park project starts on January 2nd, 2019 and ends on December 13th, 2019. The duration of the project is 281 days. Scheduling is done with the bar chart method and PDM. The total project cost estimation is Rp 63,270,319,051. <p align="justify"> <br />
format Final Project
author YEODA - NIM: 15014033, DANIEL
spellingShingle YEODA - NIM: 15014033, DANIEL
DETAILED DESIGN OF CONSTRUCTION METHOD, SCHEDULING, AND CONSTRUCTION COST ESTIMATION OF AQUAMARINE PARK PROJECT, PULAU SERANGAN, BALI
author_facet YEODA - NIM: 15014033, DANIEL
author_sort YEODA - NIM: 15014033, DANIEL
title DETAILED DESIGN OF CONSTRUCTION METHOD, SCHEDULING, AND CONSTRUCTION COST ESTIMATION OF AQUAMARINE PARK PROJECT, PULAU SERANGAN, BALI
title_short DETAILED DESIGN OF CONSTRUCTION METHOD, SCHEDULING, AND CONSTRUCTION COST ESTIMATION OF AQUAMARINE PARK PROJECT, PULAU SERANGAN, BALI
title_full DETAILED DESIGN OF CONSTRUCTION METHOD, SCHEDULING, AND CONSTRUCTION COST ESTIMATION OF AQUAMARINE PARK PROJECT, PULAU SERANGAN, BALI
title_fullStr DETAILED DESIGN OF CONSTRUCTION METHOD, SCHEDULING, AND CONSTRUCTION COST ESTIMATION OF AQUAMARINE PARK PROJECT, PULAU SERANGAN, BALI
title_full_unstemmed DETAILED DESIGN OF CONSTRUCTION METHOD, SCHEDULING, AND CONSTRUCTION COST ESTIMATION OF AQUAMARINE PARK PROJECT, PULAU SERANGAN, BALI
title_sort detailed design of construction method, scheduling, and construction cost estimation of aquamarine park project, pulau serangan, bali
url https://digilib.itb.ac.id/gdl/view/26370
_version_ 1821934054560235520