#TITLE_ALTERNATIVE#
Gas plateau rate is one important thing to be agreed in oil and gas cooperation contract between contractor, Government, and buyer because those three sides have different interest. Contractor want gas recovery factor as high as possible in the early phase of production with as high as possible gas...
Saved in:
Main Author: | KURNIAWAN DUHA (NIM : 12210011), DANY |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/26384 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: WAYAN RAKANANDA SAPUTRA (NIM : 12210011), I -
#TITLE_ALTERNATIVE#
by: ROMANUS DUHA (NIM : 12213066), DODI -
#TITLE_ALTERNATIVE#
by: ARYANTO (NIM: 20815011), DANY -
#TITLE_ALTERNATIVE#
by: EKA SAPUTRA (NIM 13601043), DANY -
#TITLE_ALTERNATIVE#
by: (NIM 13203003), KURNIAWAN