Design Concept Assembly Facility Layout Stirling Engine Beta 200 W

<p align="justify">Electircity is familiar in humanity. This electrical power is always used in daily life. The need of electricity becomes the primary need for every citizen in terms of lighting. According to Ministry of Energy and Mineral Resources, Indonesia has electrification ra...

Full description

Saved in:
Bibliographic Details
Main Author: Benitto Hartono (13114149) , Davyn
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/26420
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:26420
spelling id-itb.:264202018-09-24T15:01:58ZDesign Concept Assembly Facility Layout Stirling Engine Beta 200 W Benitto Hartono (13114149) , Davyn Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/26420 <p align="justify">Electircity is familiar in humanity. This electrical power is always used in daily life. The need of electricity becomes the primary need for every citizen in terms of lighting. According to Ministry of Energy and Mineral Resources, Indonesia has electrification ratio of 93,08% until Desember 2017. Papua and NTT has electrification ratio that is arguably low at 61,42% in Papua and 59,85% in NTT. Stirling Engine is an external combustion engine that can be used as alternative power plant for Papua. This research designed factory layout for Stirling Engine Beta 200 W assembly facility. Layout design is carried out in two types of layout which are fixed position layout and product layout with consideration of assembly line balancing to keep tasks in each work station relatively same. Both type of layout are compared and selected which is the most suitable layout for applying in assembly facility layout. In conclusion, fixed position layout is the most suitable layout that can be used as assembly facility layout for Stirling Engine Beta 200W. The production capacity is 14 units per day with a cycle time of 32,37 minutes. <p align="justify"> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description <p align="justify">Electircity is familiar in humanity. This electrical power is always used in daily life. The need of electricity becomes the primary need for every citizen in terms of lighting. According to Ministry of Energy and Mineral Resources, Indonesia has electrification ratio of 93,08% until Desember 2017. Papua and NTT has electrification ratio that is arguably low at 61,42% in Papua and 59,85% in NTT. Stirling Engine is an external combustion engine that can be used as alternative power plant for Papua. This research designed factory layout for Stirling Engine Beta 200 W assembly facility. Layout design is carried out in two types of layout which are fixed position layout and product layout with consideration of assembly line balancing to keep tasks in each work station relatively same. Both type of layout are compared and selected which is the most suitable layout for applying in assembly facility layout. In conclusion, fixed position layout is the most suitable layout that can be used as assembly facility layout for Stirling Engine Beta 200W. The production capacity is 14 units per day with a cycle time of 32,37 minutes. <p align="justify">
format Final Project
author Benitto Hartono (13114149) , Davyn
spellingShingle Benitto Hartono (13114149) , Davyn
Design Concept Assembly Facility Layout Stirling Engine Beta 200 W
author_facet Benitto Hartono (13114149) , Davyn
author_sort Benitto Hartono (13114149) , Davyn
title Design Concept Assembly Facility Layout Stirling Engine Beta 200 W
title_short Design Concept Assembly Facility Layout Stirling Engine Beta 200 W
title_full Design Concept Assembly Facility Layout Stirling Engine Beta 200 W
title_fullStr Design Concept Assembly Facility Layout Stirling Engine Beta 200 W
title_full_unstemmed Design Concept Assembly Facility Layout Stirling Engine Beta 200 W
title_sort design concept assembly facility layout stirling engine beta 200 w
url https://digilib.itb.ac.id/gdl/view/26420
_version_ 1821934070332915712