#TITLE_ALTERNATIVE#
Hydraulic fracturing is used to construct a high conductivity tunnel to allow fluids flowing easily from reservoir to wellbore hole. High conductivity tunnel is achieved by pumped sum of proppant into reservoir and keep it open. <br /> <br /> Coalbed methan (CBM) is a gas that extract fr...
Saved in:
Main Author: | FIRWANDI (NIM : 22215033), DENI |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/26481 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: (NIM 23206049), DENI -
COMPARATIVE ANALYSIS OF FINANCIAL REWARD ON GROSS SPLIT VERSUS CONVENTIONAL PSC FOR X FIELD OF Y BLOCK
by: Firwandi, Deni -
#TITLE_ALTERNATIVE#
by: DENI -
#TITLE_ALTERNATIVE#
by: DENI PURNAMA (NIM 10105018), AGUS -
#TITLE_ALTERNATIVE#
by: Arissaputra Nugroho - Nim: 15114104 , Deni