#TITLE_ALTERNATIVE#
South Tangerang City still rely on Cipeucang Landfill as municipal solid <br /> <br /> waste final disposal. Along with the population growth and limited areas in the landfill, <br /> <br /> certain waste processing mechanisms are needed to reduce the amount of waste to be &l...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/26606 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | South Tangerang City still rely on Cipeucang Landfill as municipal solid <br />
<br />
waste final disposal. Along with the population growth and limited areas in the landfill, <br />
<br />
certain waste processing mechanisms are needed to reduce the amount of waste to be <br />
<br />
dumped in landfill. Material recovery facility (MRF) will be located on two sites, with <br />
<br />
total area of 949 m2 and capacity of 10,800 kg traditional market waste per day. Waste <br />
<br />
treatments using composting and recycling inorganic waste are selected considering the <br />
<br />
dominant type of waste in Cipeucang Landfill which is organic waste and plastic waste. <br />
<br />
Bokashi composting method is chosen based on the result of scale calculation <br />
<br />
considering land area required, economic aspects, human resources, as well as <br />
<br />
operational and maintenance. Workflows in MRF are listing the incoming waste, waste <br />
<br />
sorting, organic waste treatment, plastic waste treatment, and hazardous waste <br />
<br />
treatment. The number of employees needed by Cipeucang Landfill MRF are 24 people <br />
<br />
with operational budget is Rp 3.739.061.353,50 per year. |
---|