MANAJEMEN RISIKO PROYEK JALUR GANDA KERETA API BANDARA KUALANAMU DI MEDAN DENGAN SKEMA KERJASAMA PEMERINTAH DAN BADAN USAHA (KPBU)

<br /> <br /> <br /> <br /> Polonia Airport in Medan has been closed and its role was replaced by Kualanamu Airport in Deli Serdang. The distance from Medan to Kualanamu reaches 40 km. For airplane passengers from and / or to Kualanamu Airport railway transport route Medan...

Full description

Saved in:
Bibliographic Details
Main Author: HERDIANA (NIM : 24214004), DIANITA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/26617
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:26617
spelling id-itb.:266172018-03-07T11:41:27ZMANAJEMEN RISIKO PROYEK JALUR GANDA KERETA API BANDARA KUALANAMU DI MEDAN DENGAN SKEMA KERJASAMA PEMERINTAH DAN BADAN USAHA (KPBU) HERDIANA (NIM : 24214004), DIANITA Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/26617 <br /> <br /> <br /> <br /> Polonia Airport in Medan has been closed and its role was replaced by Kualanamu Airport in Deli Serdang. The distance from Medan to Kualanamu reaches 40 km. For airplane passengers from and / or to Kualanamu Airport railway transport route Medan Kota-Bandara Kualanamu is a potential transportation. <br /> <br /> <br /> <br /> <br /> This study discusses risk management on double-track railway airport project in Medan under the Government Cooperation with Business Entity (KPBU) scheme that aims to identify potential risks by using Analytical Hierarchy Process (AHP) research methods and distribute the risks that arise right. <br /> <br /> <br /> <br /> <br /> From the research results, the political risk variable is the highest risk potential that should get attention on this project with the cause of the risk is the delay of obtaining approval and allocated to the government. However, in this project the percentage of risk allocation to the government tends to be the lowest at 3%. <br /> <br /> <br /> <br /> <br /> Risk management that can be implemented is by doing three important steps, that is risk identification, risk mitigation and risk response (risk handling) so it is hoped that the double railway project of Kualanamu airport in Medan with the scheme of KPBU can run well. <br /> <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description <br /> <br /> <br /> <br /> Polonia Airport in Medan has been closed and its role was replaced by Kualanamu Airport in Deli Serdang. The distance from Medan to Kualanamu reaches 40 km. For airplane passengers from and / or to Kualanamu Airport railway transport route Medan Kota-Bandara Kualanamu is a potential transportation. <br /> <br /> <br /> <br /> <br /> This study discusses risk management on double-track railway airport project in Medan under the Government Cooperation with Business Entity (KPBU) scheme that aims to identify potential risks by using Analytical Hierarchy Process (AHP) research methods and distribute the risks that arise right. <br /> <br /> <br /> <br /> <br /> From the research results, the political risk variable is the highest risk potential that should get attention on this project with the cause of the risk is the delay of obtaining approval and allocated to the government. However, in this project the percentage of risk allocation to the government tends to be the lowest at 3%. <br /> <br /> <br /> <br /> <br /> Risk management that can be implemented is by doing three important steps, that is risk identification, risk mitigation and risk response (risk handling) so it is hoped that the double railway project of Kualanamu airport in Medan with the scheme of KPBU can run well. <br /> <br />
format Theses
author HERDIANA (NIM : 24214004), DIANITA
spellingShingle HERDIANA (NIM : 24214004), DIANITA
MANAJEMEN RISIKO PROYEK JALUR GANDA KERETA API BANDARA KUALANAMU DI MEDAN DENGAN SKEMA KERJASAMA PEMERINTAH DAN BADAN USAHA (KPBU)
author_facet HERDIANA (NIM : 24214004), DIANITA
author_sort HERDIANA (NIM : 24214004), DIANITA
title MANAJEMEN RISIKO PROYEK JALUR GANDA KERETA API BANDARA KUALANAMU DI MEDAN DENGAN SKEMA KERJASAMA PEMERINTAH DAN BADAN USAHA (KPBU)
title_short MANAJEMEN RISIKO PROYEK JALUR GANDA KERETA API BANDARA KUALANAMU DI MEDAN DENGAN SKEMA KERJASAMA PEMERINTAH DAN BADAN USAHA (KPBU)
title_full MANAJEMEN RISIKO PROYEK JALUR GANDA KERETA API BANDARA KUALANAMU DI MEDAN DENGAN SKEMA KERJASAMA PEMERINTAH DAN BADAN USAHA (KPBU)
title_fullStr MANAJEMEN RISIKO PROYEK JALUR GANDA KERETA API BANDARA KUALANAMU DI MEDAN DENGAN SKEMA KERJASAMA PEMERINTAH DAN BADAN USAHA (KPBU)
title_full_unstemmed MANAJEMEN RISIKO PROYEK JALUR GANDA KERETA API BANDARA KUALANAMU DI MEDAN DENGAN SKEMA KERJASAMA PEMERINTAH DAN BADAN USAHA (KPBU)
title_sort manajemen risiko proyek jalur ganda kereta api bandara kualanamu di medan dengan skema kerjasama pemerintah dan badan usaha (kpbu)
url https://digilib.itb.ac.id/gdl/view/26617
_version_ 1822921974832168960