EVALUATING CHANGE MANAGEMENT INITIATIVE A CASE OF PROCEDURE ALIGNMENT IN INTEGRATED BANK

Bank is a financial institution that provides financial services to the public. In conducting its business, the bank still relies on existing services in branches even though banks already have services with digital channel. In the development of bank business, merger and acquisition is one of optio...

Full description

Saved in:
Bibliographic Details
Main Author: MARESTIAN (NIM 29115355), DOLY
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/26747
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:26747
spelling id-itb.:267472018-03-20T15:36:49ZEVALUATING CHANGE MANAGEMENT INITIATIVE A CASE OF PROCEDURE ALIGNMENT IN INTEGRATED BANK MARESTIAN (NIM 29115355), DOLY Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/26747 Bank is a financial institution that provides financial services to the public. In conducting its business, the bank still relies on existing services in branches even though banks already have services with digital channel. In the development of bank business, merger and acquisition is one of option. "Bank Acquirer" is a long-standing foreign bank in Indonesia, in 2008 it acquired the shares of "Acquired Bank". As a consequence of ownership in two banks, the integration of the bank is need to conducted according to single presence policy. <br /> <br /> <br /> The integration plan has begun in 2015, scheduled and realized in April 2017. To prepare the integration, Management then formed a Project Management Office (PMO) with the best staffs from both banks. One of project under the PMO is Project Alignment Procedure. Project Alignment Procedure is established to prepare Standard Operating Procedure (SOP) documents to be implemented in integrated banks. This new SOP is very important to standardize operational processes in the branch, so as to avoid disruption of services to customers. The new procedure implemented in integrated banks is a big change, so it should be handled appropriately for successful change. However, after integration and thereafter, it was found that the implementation of the new procedure was not working properly. Not well-implemented procedures by the branch staff may disrupt services to customers and prospective bank customers. <br /> <br /> <br /> This study is written to evaluate the Project Alignment Procedure using a qualitative approach. The change management model used is 8-step model of change from Kotters. The changes model confirmed by interview with key stakeholders related to the Project Alignment Procedure. Any information obtained in the interview will be adjusted to the 8 step change model of Kotter. Items that are found to be inconsistent with the model will be considered as an error in handling change and are considered as the root cause of not well-implemented the new procedure. <br /> <br /> <br /> From the research found that the project team is considered performed well for steps 1-4 of 8 steps Kotter . While the on steps 5-8 there are various types of errors made. Such errors are; failure in empower the vision, creating short term win, build on the change, and anchoring the change. The error in implementation Kotter’s 8 step change model cause the change was not implemented properly <br /> <br /> <br /> Improvements and corrective action are needed to bring this change back to the right track. Improvement actions are formulated in accordance with detail in Kotter's steps which have not been implemented properly. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Bank is a financial institution that provides financial services to the public. In conducting its business, the bank still relies on existing services in branches even though banks already have services with digital channel. In the development of bank business, merger and acquisition is one of option. "Bank Acquirer" is a long-standing foreign bank in Indonesia, in 2008 it acquired the shares of "Acquired Bank". As a consequence of ownership in two banks, the integration of the bank is need to conducted according to single presence policy. <br /> <br /> <br /> The integration plan has begun in 2015, scheduled and realized in April 2017. To prepare the integration, Management then formed a Project Management Office (PMO) with the best staffs from both banks. One of project under the PMO is Project Alignment Procedure. Project Alignment Procedure is established to prepare Standard Operating Procedure (SOP) documents to be implemented in integrated banks. This new SOP is very important to standardize operational processes in the branch, so as to avoid disruption of services to customers. The new procedure implemented in integrated banks is a big change, so it should be handled appropriately for successful change. However, after integration and thereafter, it was found that the implementation of the new procedure was not working properly. Not well-implemented procedures by the branch staff may disrupt services to customers and prospective bank customers. <br /> <br /> <br /> This study is written to evaluate the Project Alignment Procedure using a qualitative approach. The change management model used is 8-step model of change from Kotters. The changes model confirmed by interview with key stakeholders related to the Project Alignment Procedure. Any information obtained in the interview will be adjusted to the 8 step change model of Kotter. Items that are found to be inconsistent with the model will be considered as an error in handling change and are considered as the root cause of not well-implemented the new procedure. <br /> <br /> <br /> From the research found that the project team is considered performed well for steps 1-4 of 8 steps Kotter . While the on steps 5-8 there are various types of errors made. Such errors are; failure in empower the vision, creating short term win, build on the change, and anchoring the change. The error in implementation Kotter’s 8 step change model cause the change was not implemented properly <br /> <br /> <br /> Improvements and corrective action are needed to bring this change back to the right track. Improvement actions are formulated in accordance with detail in Kotter's steps which have not been implemented properly.
format Theses
author MARESTIAN (NIM 29115355), DOLY
spellingShingle MARESTIAN (NIM 29115355), DOLY
EVALUATING CHANGE MANAGEMENT INITIATIVE A CASE OF PROCEDURE ALIGNMENT IN INTEGRATED BANK
author_facet MARESTIAN (NIM 29115355), DOLY
author_sort MARESTIAN (NIM 29115355), DOLY
title EVALUATING CHANGE MANAGEMENT INITIATIVE A CASE OF PROCEDURE ALIGNMENT IN INTEGRATED BANK
title_short EVALUATING CHANGE MANAGEMENT INITIATIVE A CASE OF PROCEDURE ALIGNMENT IN INTEGRATED BANK
title_full EVALUATING CHANGE MANAGEMENT INITIATIVE A CASE OF PROCEDURE ALIGNMENT IN INTEGRATED BANK
title_fullStr EVALUATING CHANGE MANAGEMENT INITIATIVE A CASE OF PROCEDURE ALIGNMENT IN INTEGRATED BANK
title_full_unstemmed EVALUATING CHANGE MANAGEMENT INITIATIVE A CASE OF PROCEDURE ALIGNMENT IN INTEGRATED BANK
title_sort evaluating change management initiative a case of procedure alignment in integrated bank
url https://digilib.itb.ac.id/gdl/view/26747
_version_ 1821934169268158464