DEVELOPMENT CRITERIA AND WEIGHTED IN EVALUATION STAGE OF SUPPLIER SELECTION AT GAS ENGINE POWER PLANT EPC PROJECT

The high level of business development in the construction industry demands major <br /> <br /> contractors to improve performance in order to achieve the company's profit targets. <br /> <br /> Annual report data 2013-2016 from PT. Wijaya Karya (Persero) Tbk, as the <...

Full description

Saved in:
Bibliographic Details
Main Author: DWI PRASETYO NIM 94516011, ERLANGGA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/26964
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia