DEVELOPMENT CRITERIA AND WEIGHTED IN EVALUATION STAGE OF SUPPLIER SELECTION AT GAS ENGINE POWER PLANT EPC PROJECT
The high level of business development in the construction industry demands major <br /> <br /> contractors to improve performance in order to achieve the company's profit targets. <br /> <br /> Annual report data 2013-2016 from PT. Wijaya Karya (Persero) Tbk, as the <...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/26964 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |