In terms of cost, developing a geothermal power generation will require roughly 40% of all cost spent on wells and field development. This leads to a challenge for well, so that it is more cost efficient. To answer it, one of its innovations is by reducing the diameter into small one or commonly kno...
Saved in:
Main Author: | MAKARIM (NIM : 12213024), FAUZAN |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/27228 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: MAKARIM BASUKI (NIM : 10212044), RAYHAN -
#TITLE_ALTERNATIVE#
by: SAIFUDDIN (NIM 23004016), FAUZAN -
#TITLE_ALTERNATIVE#
by: Najib Fauzan (NIM S2888610), Muh -
#TITLE_ALTERNATIVE#
by: FIRDA FAUZAN (NIM 13504127), MOHAMAD -
#TITLE_ALTERNATIVE#
by: Rony Fauzan (NIM : 13502021), Achmad