REVIEW AND REDESIGN WATER TREATMENT PLANT OF PDAM TIRTA RAHARJA CIKONENG KABUPATEN BANDUNG

Increasing water demand in Bandung Regency needs to be balanced with increasing the capacity to provide drinking water services to meet the increasing drinking water needs of the community. One of the drinking water providers in Bandung Regency is PDAM Tirta Raharja which has many branches, one of w...

Full description

Saved in:
Bibliographic Details
Main Author: NIM: 15314048, FEBRIANSYAH
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/27255
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:Increasing water demand in Bandung Regency needs to be balanced with increasing the capacity to provide drinking water services to meet the increasing drinking water needs of the community. One of the drinking water providers in Bandung Regency is PDAM Tirta Raharja which has many branches, one of which is Cikoneng WTP which has three installations each processing flow of 200 L / sec (IPA 1), 150 L / sec (IPA 2), and 50 L / second (IPA 3), along with population growth, of course, it is necessary to increase the processed quantity in the Cikoneng WTP, based on the projection in 2026 it is necessary to increase the debit by 421 L / sec to meet the water demand of the service area according to the target. This study aims to increase the capacity of the Cikoneng Processing Installation (Cikoneng WTP) through evaluation and development (uprating). The focus of this research is on the IPA 1, the processing debit will be 407 L / sec. Evaluation is carried out on coagulation, flocculation, sedimentation, filtration and reservoir units based on design criteria. Evaluation also takes into account the quality of raw water and production water. The quality of the production water tested meets PERMENKES 492/2010.