EVALUATION STUDY OF BUILDING INFORMATION MODELING (bim) MATURITY LEVEL AND IMPLEMENTATION ROADMAP IN INDONESIA
<p align="justify">The construction sector has a strategic role in Indonesia's development with the <br /> <br /> value of construction investment increasing every year. The increased value of <br /> <br /> construction investment in Indonesia as the deve...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/27427 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | <p align="justify">The construction sector has a strategic role in Indonesia's development with the <br />
<br />
value of construction investment increasing every year. The increased value of <br />
<br />
construction investment in Indonesia as the development of modeling based <br />
<br />
technology or BIM (Building Information Modeling) in the world construction <br />
<br />
industry. BIM is believed to have many benefits in the management of <br />
<br />
construction projects, but its implementation in Indonesia is still relatively low. <br />
<br />
Some countries that have implemented BIM have already developed BIM's <br />
<br />
implementation roadmap as one of the strategies to improve implementation in the <br />
<br />
country. Although Indonesia already has a BIM implementation roadmap, the <br />
<br />
BIM implementation roadmap is not yet based on the maturity level of the <br />
<br />
existing construction industry condition, thus not having a good enough effect on <br />
<br />
the performance of the construction industry in Indonesia. Therefore, it is <br />
<br />
necessary to study the study of roadmap development of BIM implementation <br />
<br />
based on maturity level in Indonesia. <br />
<br />
This study aims to evaluate the level of maturity and roadmap of BIM <br />
<br />
implementation in Indonesia, to be utilized in developing better BIM <br />
<br />
implementation strategy. The research method is a qualitative method with three <br />
<br />
stages of research, the first stage aims to identify the BIM maturity level in <br />
<br />
Indonesia and the factors that influence it. The second phase aims to develop a <br />
<br />
BIM implementation roadmap based on the current BIM maturity level in <br />
<br />
Indonesia as well as the direction of roadmap development gained from best <br />
<br />
practice roadmap implementation in several countries. And the third stage is <br />
<br />
validation of research to ensure the direction of recommendations in accordance <br />
<br />
with the real needs of BIM implementation in Indonesia. <br />
<br />
From the first stage of research, it is known that the level of maturity of BIM in <br />
<br />
Indonesia is still at level 1 (object-based modeling) that is to level maturity level 2 <br />
<br />
of 5 level maturity used in evaluation process. The low level of maturity is due to <br />
<br />
the uneven implementation of BIM in all project stakeholders in Indonesia. <br />
<br />
Internally, the cases show significant difference in maturity index. Data collected <br />
<br />
from some key stakeholders of the Indonesian construction industry show that the <br />
<br />
owner / developer has a higher level of maturity when compared to consultants <br />
<br />
and contractors. This shows the direction of positive implementation because the <br />
<br />
majority of projects are from the owner / developer, so the number of projects <br />
<br />
with BIM implementation is expected to continue to grow as more owners / <br />
<br />
developers understand the importance of BIM implementation.The second phase <br />
<br />
of research begins by conducting a best practice study on the development of BIM <br />
<br />
implementation road in several countries in the world. From the second stage of <br />
<br />
the research, BIM implementation roadmap is developed in Indonesia based on <br />
<br />
maturity level and also best practice roadmap of BIM implementation. The results <br />
<br />
of the best practice evaluation show that the duration of the roadmap ranges from <br />
<br />
4 to 5 years. The results of the study show that some of the strategies that need to <br />
<br />
be incorporated into the development of the BIM implementation roadmap <br />
<br />
include: (1) preparation of BIM implementation plans / strategies, (2) BIM <br />
<br />
implementation by government in the public sector, (3) development of standards, <br />
<br />
guidelines, protocols, curricula, accreditation or contractual BIM, (4) movement <br />
<br />
and promotion of BIM use, (5) mandatory implementation of BIM nationally. <br />
<br />
And from the results of the third stage of research in the form of validation, <br />
<br />
obtained the results of interviews that all experts argue that the results of research <br />
<br />
have been in accordance with the conditions and needs of the current <br />
<br />
implementation of BIM.<p align="justify"> |
---|