PLANNING METHOD OF SULTAN THAHA AIRPORT TERMINAL IN JAMBI
Rapid population growth must be balanced with the provision of adequate infrastructure facilities so that people needs can be fulfilled. One of the airports that have increased capacity is the Sultan Thaha International Airport, Jambi through the construction of a new terminal. <br />...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/27708 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Rapid population growth must be balanced with the provision of adequate infrastructure facilities so that people needs can be fulfilled. One of the airports that have increased capacity is the Sultan Thaha International Airport, Jambi through the construction of a new terminal. <br />
<br />
<br />
In the process of infrastructure construction, there are three important aspects that must be considered, which are time, quality and cost known as triple constraint. Planners should choose the most efficient way to keep the duration of construction process as soon as possible, at minimum cost, but the quality of the <br />
<br />
resulting output remains qualified. Therefore, this study was made with the aim to determin a good construction management planning to achieve the above three aspects. <br />
<br />
<br />
Planning of construction management consists of various aspects, which are determine the method of construction, quantificate the tool, worker and material requirement, determine the implementation schedule of work and estimated the costs of the work. This final project is arranged in an integrated manner based on design aspects of strutur, geotechnical, transportation, water, and <br />
<br />
construction management. The data used for construction management comes from the results of structural and geotechnical design. <br />
<br />
<br />
Determining the method of construction, based on consideration of quality criteria, cost criteria and scheduling criteria. The Sultan Thaha Airport Terminal <br />
<br />
Project, Jambi can be completed within 176 days (Start Time: March 1, 2017, End Time: September 7, 2017). The value of the Payment Budget Plan (RAB) to be carried out on the construction of Sukaha Thaha Airport Terminal, Jambi is Rp 202,134,779,000.00. |
---|