IMPROVEMENT PROPOSAL FOR NC212i AIRPLANE FUSELAGE ASSEMBLY LINE OF PT DIRGANTARA INDONESIA

PT Dirgantara Indonesia is a state-owned enterprise (BUMN) which runs aeronautics business. Airplane and helicopter production is the main business of the company. In 2018, NC212i is one of the airplanes with highest demand that is 6 units. However, Head of Component Assembly stated that PT Dirganta...

Full description

Saved in:
Bibliographic Details
Main Author: ABDUL GHANI NIM 13414111, HELMI
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/27793
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:27793
spelling id-itb.:277932018-09-28T14:05:16ZIMPROVEMENT PROPOSAL FOR NC212i AIRPLANE FUSELAGE ASSEMBLY LINE OF PT DIRGANTARA INDONESIA ABDUL GHANI NIM 13414111, HELMI Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/27793 PT Dirgantara Indonesia is a state-owned enterprise (BUMN) which runs aeronautics business. Airplane and helicopter production is the main business of the company. In 2018, NC212i is one of the airplanes with highest demand that is 6 units. However, Head of Component Assembly stated that PT Dirgantara Indonesia is only able to reach NC212i production rate of 4 planes per year. <br /> <br /> In the major sub-assembly production, fuselage part took the longest time which is 3 months. Moreover , problem owner demanded a balanced assembly line. Due to the finding of non-optimum work element allocations, treatment was done by reallocating work element through mathematical model. Adopted mathematical model is integer linear programming. The objective function is to minimize sum of squared deviation. Desired cycle time is used as a constraint. Thereupon, two adjustments were performed onto the model, namely the addition of workstation unit constraint and change in objective function to smoothness index minimization. Computation was performed using LINGO software. <br /> <br /> Computation was performed several time based on number of jig with actual cycle time problem, due to unexchangeable inter-jig work elements and to reduce computational workload. Computation resulted in work element allocations into stations. The resulting solution reduced actual cycle time of assembly line from 1010.4 hours to 299 hours. SI was reduced from 3007.77 to 574.65. Workstation was increased from 16 units to 25 units. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT Dirgantara Indonesia is a state-owned enterprise (BUMN) which runs aeronautics business. Airplane and helicopter production is the main business of the company. In 2018, NC212i is one of the airplanes with highest demand that is 6 units. However, Head of Component Assembly stated that PT Dirgantara Indonesia is only able to reach NC212i production rate of 4 planes per year. <br /> <br /> In the major sub-assembly production, fuselage part took the longest time which is 3 months. Moreover , problem owner demanded a balanced assembly line. Due to the finding of non-optimum work element allocations, treatment was done by reallocating work element through mathematical model. Adopted mathematical model is integer linear programming. The objective function is to minimize sum of squared deviation. Desired cycle time is used as a constraint. Thereupon, two adjustments were performed onto the model, namely the addition of workstation unit constraint and change in objective function to smoothness index minimization. Computation was performed using LINGO software. <br /> <br /> Computation was performed several time based on number of jig with actual cycle time problem, due to unexchangeable inter-jig work elements and to reduce computational workload. Computation resulted in work element allocations into stations. The resulting solution reduced actual cycle time of assembly line from 1010.4 hours to 299 hours. SI was reduced from 3007.77 to 574.65. Workstation was increased from 16 units to 25 units.
format Final Project
author ABDUL GHANI NIM 13414111, HELMI
spellingShingle ABDUL GHANI NIM 13414111, HELMI
IMPROVEMENT PROPOSAL FOR NC212i AIRPLANE FUSELAGE ASSEMBLY LINE OF PT DIRGANTARA INDONESIA
author_facet ABDUL GHANI NIM 13414111, HELMI
author_sort ABDUL GHANI NIM 13414111, HELMI
title IMPROVEMENT PROPOSAL FOR NC212i AIRPLANE FUSELAGE ASSEMBLY LINE OF PT DIRGANTARA INDONESIA
title_short IMPROVEMENT PROPOSAL FOR NC212i AIRPLANE FUSELAGE ASSEMBLY LINE OF PT DIRGANTARA INDONESIA
title_full IMPROVEMENT PROPOSAL FOR NC212i AIRPLANE FUSELAGE ASSEMBLY LINE OF PT DIRGANTARA INDONESIA
title_fullStr IMPROVEMENT PROPOSAL FOR NC212i AIRPLANE FUSELAGE ASSEMBLY LINE OF PT DIRGANTARA INDONESIA
title_full_unstemmed IMPROVEMENT PROPOSAL FOR NC212i AIRPLANE FUSELAGE ASSEMBLY LINE OF PT DIRGANTARA INDONESIA
title_sort improvement proposal for nc212i airplane fuselage assembly line of pt dirgantara indonesia
url https://digilib.itb.ac.id/gdl/view/27793
_version_ 1822922363466940416