MENGURANGI WAKTU PENGERJAAN PADA PENGEMBANGAN PRODUK BARU DAN MENGIMPLEMENTASIKAN SISTEM INFORMASI

ABSTRACT <br /> <br /> Now day the development of automotive industry in Indonesia is increasing, we can see in car sales every year increasing. Various brands of cars in Indonesia get benefit from increasing vehicle sales in Indonesia, not only automotive brands but also manufacture of...

Full description

Saved in:
Bibliographic Details
Main Author: ZAELAN (NIM: 29115730), IRWAN
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/28147
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:28147
spelling id-itb.:281472018-02-15T14:23:16ZMENGURANGI WAKTU PENGERJAAN PADA PENGEMBANGAN PRODUK BARU DAN MENGIMPLEMENTASIKAN SISTEM INFORMASI ZAELAN (NIM: 29115730), IRWAN Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/28147 ABSTRACT <br /> <br /> Now day the development of automotive industry in Indonesia is increasing, we can see in car sales every year increasing. Various brands of cars in Indonesia get benefit from increasing vehicle sales in Indonesia, not only automotive brands but also manufacture of automotive components. There for each company will attempt to attract consumers to buy their products. The impact is vehicle company makes new models updated, and it make new product component created in manufacture also. The research site of this thesis is in automotive component manufacturing factory. <br /> <br /> This research using DMAIC methodology (Define, Measure, Analysis, Control). Define will explain about the new project Purge Hose Canister. Measure will show the calculation. Analysis will open up the possibility of the root of the problem. Control will show an effort to resolve this problem sustainably. <br /> <br /> PT. XYZ is a manufacturer of automotive components, therefore, as the acceleration of the needs of new components model required by Agen Tunggal Pemegang Merek (ATPM), PT. XYZ requires speed up in developing New Product. Issue in PT. XYZ is the development time of 7 months on the paper according to engineer data. The second problem is the recording of data seen at the time of stock op-name, actual mismatch and data discrepancies reached Rp 2,329,539,147 Because of it will affect the validation of data when the consumer doing audit. Root problem at PT. XYZ is on the data recording that causes the data is improper and also damaged the Lathe machine. This research has two different root causes, therefore problem solving is divided into two problem solving. The first problem of the development of new product is completed by purchasing Lathe machine and shortening the development of new product to 5 months. Second is data recording problems are done by making Management Information System (MIS). With this research is expected to be useful for the company to achieve customer satisfaction. <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description ABSTRACT <br /> <br /> Now day the development of automotive industry in Indonesia is increasing, we can see in car sales every year increasing. Various brands of cars in Indonesia get benefit from increasing vehicle sales in Indonesia, not only automotive brands but also manufacture of automotive components. There for each company will attempt to attract consumers to buy their products. The impact is vehicle company makes new models updated, and it make new product component created in manufacture also. The research site of this thesis is in automotive component manufacturing factory. <br /> <br /> This research using DMAIC methodology (Define, Measure, Analysis, Control). Define will explain about the new project Purge Hose Canister. Measure will show the calculation. Analysis will open up the possibility of the root of the problem. Control will show an effort to resolve this problem sustainably. <br /> <br /> PT. XYZ is a manufacturer of automotive components, therefore, as the acceleration of the needs of new components model required by Agen Tunggal Pemegang Merek (ATPM), PT. XYZ requires speed up in developing New Product. Issue in PT. XYZ is the development time of 7 months on the paper according to engineer data. The second problem is the recording of data seen at the time of stock op-name, actual mismatch and data discrepancies reached Rp 2,329,539,147 Because of it will affect the validation of data when the consumer doing audit. Root problem at PT. XYZ is on the data recording that causes the data is improper and also damaged the Lathe machine. This research has two different root causes, therefore problem solving is divided into two problem solving. The first problem of the development of new product is completed by purchasing Lathe machine and shortening the development of new product to 5 months. Second is data recording problems are done by making Management Information System (MIS). With this research is expected to be useful for the company to achieve customer satisfaction. <br />
format Theses
author ZAELAN (NIM: 29115730), IRWAN
spellingShingle ZAELAN (NIM: 29115730), IRWAN
MENGURANGI WAKTU PENGERJAAN PADA PENGEMBANGAN PRODUK BARU DAN MENGIMPLEMENTASIKAN SISTEM INFORMASI
author_facet ZAELAN (NIM: 29115730), IRWAN
author_sort ZAELAN (NIM: 29115730), IRWAN
title MENGURANGI WAKTU PENGERJAAN PADA PENGEMBANGAN PRODUK BARU DAN MENGIMPLEMENTASIKAN SISTEM INFORMASI
title_short MENGURANGI WAKTU PENGERJAAN PADA PENGEMBANGAN PRODUK BARU DAN MENGIMPLEMENTASIKAN SISTEM INFORMASI
title_full MENGURANGI WAKTU PENGERJAAN PADA PENGEMBANGAN PRODUK BARU DAN MENGIMPLEMENTASIKAN SISTEM INFORMASI
title_fullStr MENGURANGI WAKTU PENGERJAAN PADA PENGEMBANGAN PRODUK BARU DAN MENGIMPLEMENTASIKAN SISTEM INFORMASI
title_full_unstemmed MENGURANGI WAKTU PENGERJAAN PADA PENGEMBANGAN PRODUK BARU DAN MENGIMPLEMENTASIKAN SISTEM INFORMASI
title_sort mengurangi waktu pengerjaan pada pengembangan produk baru dan mengimplementasikan sistem informasi
url https://digilib.itb.ac.id/gdl/view/28147
_version_ 1821994980622729216