ESTIMATING CLAIM RESERVE IN GENERAL INSURANCE

Claim reserve is an estimate of the value of a claim or group of claims not yet paid. In this Final Project claim reserve and its standard error in general insurance estimated using Mack Chain Ladder method. Mack Chain Ladder method use data with run-off triangle format. First, the concepts necessar...

Full description

Saved in:
Bibliographic Details
Main Author: KADRI ALI (NIM: 10114017), JERRI
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/28261
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:Claim reserve is an estimate of the value of a claim or group of claims not yet paid. In this Final Project claim reserve and its standard error in general insurance estimated using Mack Chain Ladder method. Mack Chain Ladder method use data with run-off triangle format. First, the concepts necessary to use the Mack Chain Ladder are explained. Then, the method is applied to the regular run-off triangle data obtained from Taylor and Ashe (1983) and irregular run-off triangle data. The results will be compared with the results obtained through the Vector Projection method. It can be concluded even though Mack Chain Ladder method is the most popular method used among actuaries but the method still has deficiencies when the data used does not meet the assumption so that resulting a large standard error.