STUDY AND DESIGN OFF-GRID OF HYBRID POWER SYSTEM FOR COMMUNAL AND ADMNISTRATIVE LOAD AT 3 REGIONS IN MALUKU, INDONESIA

Abstract— Indonesia is a developing country with a population of about 250 million people, so that the needs of electricity in Indonesia is quite high. Although Indonesia’s ratio of electrification is already reach 92.80 % at the end of June 2017, there are still many remote and underdeveloped...

Full description

Saved in:
Bibliographic Details
Main Author: Faridah - NIM: 23216301 , Linda
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/28609
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:28609
spelling id-itb.:286092018-10-01T10:02:54ZSTUDY AND DESIGN OFF-GRID OF HYBRID POWER SYSTEM FOR COMMUNAL AND ADMNISTRATIVE LOAD AT 3 REGIONS IN MALUKU, INDONESIA Faridah - NIM: 23216301 , Linda Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/28609 Abstract— Indonesia is a developing country with a population of about 250 million people, so that the needs of electricity in Indonesia is quite high. Although Indonesia’s ratio of electrification is already reach 92.80 % at the end of June 2017, there are still many remote and underdeveloped villages at Indonesia which still haven’t got any electricity at al. Without electricity, development at these villages will be quite hard. Power plan with hybrid energy system can be used as one solution to increased the electrification ratio by utilizing renewable energy potentials which are available in the designated area. Hybrid energy system integrated renewable energy source to generate electrical energy to be delivered area. The study was done using software HOMER Pro, PVsys, and PVsol for communal load and administrative load in one region left behind, the outermost and forefront in Indonesia namely Wairatan, Klishatu and Leiting Village in Maluku Indonesia. <br /> <br /> <br /> <br /> The result of this study for Klistahu village the most optimal power generation system was hybrid PV-Generator with LCOE Rp. 6421 with RF 94% (communal load) and Rp. 8745 with RF 99.60% (administrative load), Wairatan village power generation system which the most optimal is hybrid PV-Turbin Angin-Generator with LCOE Rp. 6163 with RF 96.7% (communal load) and Rp. 8903 with RF 99.70% (administrative load), Leiting village the most optimal power plant system is hybrid PV-Turbin Angin -Generator with LCOE Rp. 7566 with 81.4% RF (communal load) and Rp. 9230 with RF 98.90 (administrative load), so the LCOE range for Maluku province is Rp. 6421 - Rp. 7566 (communal load) and Rp. 8745 - Rp. 9230 (administrative load).Result of this study can use to improved Rural Electrification Program (Program Listrik Pedesaan) and Bright Indonesia Program (Program Indonesia Terang). text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Abstract— Indonesia is a developing country with a population of about 250 million people, so that the needs of electricity in Indonesia is quite high. Although Indonesia’s ratio of electrification is already reach 92.80 % at the end of June 2017, there are still many remote and underdeveloped villages at Indonesia which still haven’t got any electricity at al. Without electricity, development at these villages will be quite hard. Power plan with hybrid energy system can be used as one solution to increased the electrification ratio by utilizing renewable energy potentials which are available in the designated area. Hybrid energy system integrated renewable energy source to generate electrical energy to be delivered area. The study was done using software HOMER Pro, PVsys, and PVsol for communal load and administrative load in one region left behind, the outermost and forefront in Indonesia namely Wairatan, Klishatu and Leiting Village in Maluku Indonesia. <br /> <br /> <br /> <br /> The result of this study for Klistahu village the most optimal power generation system was hybrid PV-Generator with LCOE Rp. 6421 with RF 94% (communal load) and Rp. 8745 with RF 99.60% (administrative load), Wairatan village power generation system which the most optimal is hybrid PV-Turbin Angin-Generator with LCOE Rp. 6163 with RF 96.7% (communal load) and Rp. 8903 with RF 99.70% (administrative load), Leiting village the most optimal power plant system is hybrid PV-Turbin Angin -Generator with LCOE Rp. 7566 with 81.4% RF (communal load) and Rp. 9230 with RF 98.90 (administrative load), so the LCOE range for Maluku province is Rp. 6421 - Rp. 7566 (communal load) and Rp. 8745 - Rp. 9230 (administrative load).Result of this study can use to improved Rural Electrification Program (Program Listrik Pedesaan) and Bright Indonesia Program (Program Indonesia Terang).
format Theses
author Faridah - NIM: 23216301 , Linda
spellingShingle Faridah - NIM: 23216301 , Linda
STUDY AND DESIGN OFF-GRID OF HYBRID POWER SYSTEM FOR COMMUNAL AND ADMNISTRATIVE LOAD AT 3 REGIONS IN MALUKU, INDONESIA
author_facet Faridah - NIM: 23216301 , Linda
author_sort Faridah - NIM: 23216301 , Linda
title STUDY AND DESIGN OFF-GRID OF HYBRID POWER SYSTEM FOR COMMUNAL AND ADMNISTRATIVE LOAD AT 3 REGIONS IN MALUKU, INDONESIA
title_short STUDY AND DESIGN OFF-GRID OF HYBRID POWER SYSTEM FOR COMMUNAL AND ADMNISTRATIVE LOAD AT 3 REGIONS IN MALUKU, INDONESIA
title_full STUDY AND DESIGN OFF-GRID OF HYBRID POWER SYSTEM FOR COMMUNAL AND ADMNISTRATIVE LOAD AT 3 REGIONS IN MALUKU, INDONESIA
title_fullStr STUDY AND DESIGN OFF-GRID OF HYBRID POWER SYSTEM FOR COMMUNAL AND ADMNISTRATIVE LOAD AT 3 REGIONS IN MALUKU, INDONESIA
title_full_unstemmed STUDY AND DESIGN OFF-GRID OF HYBRID POWER SYSTEM FOR COMMUNAL AND ADMNISTRATIVE LOAD AT 3 REGIONS IN MALUKU, INDONESIA
title_sort study and design off-grid of hybrid power system for communal and admnistrative load at 3 regions in maluku, indonesia
url https://digilib.itb.ac.id/gdl/view/28609
_version_ 1822922641039687680