#TITLE_ALTERNATIVE#
Underground mine stability becomes one of the problems which is need to be considered when open an underground mine. The high stress around the openings increase along with the increasing depth, it can trigger seismic activity which is cause seismic hazards. Rock mass around the opening that exposed...
Saved in:
Main Author: | PRADNYA PARAMITA (NIM: 12114013), MARIA |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/28753 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: PARAMITA (NIM 13304049), PRADNYA -
#TITLE_ALTERNATIVE#
by: ANINDITA (NIM 10103013), PRADNYA -
#TITLE_ALTERNATIVE#
by: (NIM 15403005), PARAMITA -
#TITLE_ALTERNATIVE#
by: (NIM 13504040), PARAMITA -
#TITLE_ALTERNATIVE#
by: PRATITA (NIM:15205044); Pembimbing: DR. Ir. Baskoro Tedjo, MSEB, PRADNYA