#TITLE_ALTERNATIVE#
Reservoir X is an oil reservoir which has not been produced, located at Pertamina Hulu Energi Offshore North <br /> <br /> West Java (PHE ONWJ) Field. Reservoir X is a shaly sand reservoir located at 5618 ft below the sea level and <br /> <br /> has 150 – 200 ft thickness....
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/28896 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Reservoir X is an oil reservoir which has not been produced, located at Pertamina Hulu Energi Offshore North <br />
<br />
West Java (PHE ONWJ) Field. Reservoir X is a shaly sand reservoir located at 5618 ft below the sea level and <br />
<br />
has 150 – 200 ft thickness. Reservoir X will be produced from Platform MSS, in which two alternatives of <br />
<br />
completion methods will be evaluated. In this study, monobore completion and cased hole completion, will be <br />
<br />
evaluated with the use of reservoir, NodalTM, and integrated simulation software package to determine the more <br />
<br />
suitable type of completion method in producing Reservoir X. Monobore completion and cased hole completion <br />
<br />
are built by using side track from not economical LFM Well and by drilling new slot with deck extension, <br />
<br />
respectively. The study will evaluate both completion methods technically and economically, in which technical <br />
<br />
evaluations consists of three aspects, namely Absolute Open Flow Potential (AOFP), optimum operating <br />
<br />
condition and cumulative oil production. On the other hand, economical evaluation determines Net Present <br />
<br />
Value (NPV), Rate of Return (ROR) and Pay Out Time (POT) for two completion methods. The comparison of <br />
<br />
the two methods resulted that monobore completion is better economically while cased hole completion is better <br />
<br />
technically. Hence, monobore completion is recommended to produce Reservoir X in the future. |
---|