PERHITUNGAN KESTABILAN LUBANG BUKAAN PADA TEROWONGAN HEADRACE PLTA SINGKARAK MENGGUNAKAN ANALISIS BALI
During construction of underground structure such as pressure tunnel, power house cavern, etc. Field measurement should be performed during construction phase for monitoring structure stability and updating design parameters. The constrains are found during field and laboratory test. In another hand...
Saved in:
Main Author: | Setyawan , Rudy |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/2901 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PERHITUNGAN KESTABILAN DENGAN ANALISIS BALI. PADA RUMAH PEMBANGKIT BAWAH TANAH PROYEK PLTA SINGKARAK SUMATERA BARAT
by: Fauzi, Achmad -
PENGUKURAN KONVERGEN UNTUK MENILAI KESTABILAN LUBANG BUKAAN BAWAH TANAH DI TAMBANG EMAS CIKIDANG
by: Wedhanto , Sonny -
ANALISIS KESTABILAN TEROWONGAN PADA BATUAN LEMAH DENGAN MENGGUNAKAN METODA ANALITIK (MODEL F.O. FRANCISS) (STUDI KASUS PADA TEROWONGAN TAMBANG EMAS P.T. ANEKA TAMBANG, GUNUNG PONGKOR, JAWA BARAT)
by: Karyono -
STUDI PENGUATAN LUBANG BUKAAN BAWAH TANAH DENGAN MENGGUNAKAN BAUT BATUAN PADA TAMBANG BATUBARA SAWAH LUHUNG UNIT PERTAMBANGAN OMBILIN SUMATERA BARAT
by: , Sudarsono -
PERILAKU LENTUR CASTELLATED BEAM BENTUK BUKAAN LUBANG
SEGIEMPAT DENGAN TULANGAN SENGKANG, WIRE ROPE DAN
KOMPOSIT MORTAR
by: , ROZA AMELIA, et al.
Published: (2012)