EVALUATION AND REDESIGN UNIT FLOCCULATION AND SEDIMENTATION FOR WATER TREATMENT PLANT IN PDAM TIRTAWENING PRODUCTION UNIT I BADAKSINGA
PDAM Tirtawening WTP Badaksinga located in Bandung, West Java, Indonesia. Water Treatment Plant Badaksinga (WTP) consist of two main installation which is WTP I that was build and designed by french Company; Degremont in 1958 and the second installation was bulid and designed by Dutch Company; D...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/29080 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:29080 |
---|---|
spelling |
id-itb.:290802018-07-03T08:32:21ZEVALUATION AND REDESIGN UNIT FLOCCULATION AND SEDIMENTATION FOR WATER TREATMENT PLANT IN PDAM TIRTAWENING PRODUCTION UNIT I BADAKSINGA IBRAHIM YAZDI (NIM : 15312037), MUHAMAD Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/29080 PDAM Tirtawening WTP Badaksinga located in Bandung, West Java, Indonesia. Water Treatment Plant Badaksinga (WTP) consist of two main installation which is WTP I that was build and designed by french Company; Degremont in 1958 and the second installation was bulid and designed by Dutch Company; DHV in 1989. Research method consist of three phase which are primary and secondary collecting, evaluation, and development. Flocculation unit (Clarifier) and Sedimentation Unit (Plate Settler) operate in over capacity. While, on normal operational condition, flocculation and sedimentation units operate at 200 – 300 lps, while they are designed maximum capacity at 200 lps. Over capacity at these units occur due to flow water control in PDAM Badaksinga. Flocc particle still can be seen even after the sedimentation treatment, this happened because of there is a deadzone on plate settler thus made plate settler worked less effective. Less effective of floc settling process in plate settler unit is can be cause by the plate settler position is not submerged. This condition can cause less area of settling surface. Redesign is needed for uprating the capacity of water treatment plant and improving the hydraulic system in flocculation and sedimentation unit. Redesign result are modificating the dimension of flocculator basin and plate settlers are now submerged text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
PDAM Tirtawening WTP Badaksinga located in Bandung, West Java, Indonesia. Water Treatment Plant Badaksinga (WTP) consist of two main installation which is WTP I that was build and designed by french Company; Degremont in 1958 and the second installation was bulid and designed by Dutch Company; DHV in 1989. Research method consist of three phase which are primary and secondary collecting, evaluation, and development. Flocculation unit (Clarifier) and Sedimentation Unit (Plate Settler) operate in over capacity. While, on normal operational condition, flocculation and sedimentation units operate at 200 – 300 lps, while they are designed maximum capacity at 200 lps. Over capacity at these units occur due to flow water control in PDAM Badaksinga. Flocc particle still can be seen even after the sedimentation treatment, this happened because of there is a deadzone on plate settler thus made plate settler worked less effective. Less effective of floc settling process in plate settler unit is can be cause by the plate settler position is not submerged. This condition can cause less area of settling surface. Redesign is needed for uprating the capacity of water treatment plant and improving the hydraulic system in flocculation and sedimentation unit. Redesign result are modificating the dimension of flocculator basin and plate settlers are now submerged |
format |
Final Project |
author |
IBRAHIM YAZDI (NIM : 15312037), MUHAMAD |
spellingShingle |
IBRAHIM YAZDI (NIM : 15312037), MUHAMAD EVALUATION AND REDESIGN UNIT FLOCCULATION AND SEDIMENTATION FOR WATER TREATMENT PLANT IN PDAM TIRTAWENING PRODUCTION UNIT I BADAKSINGA |
author_facet |
IBRAHIM YAZDI (NIM : 15312037), MUHAMAD |
author_sort |
IBRAHIM YAZDI (NIM : 15312037), MUHAMAD |
title |
EVALUATION AND REDESIGN UNIT FLOCCULATION AND SEDIMENTATION FOR WATER TREATMENT PLANT IN PDAM TIRTAWENING PRODUCTION UNIT I BADAKSINGA |
title_short |
EVALUATION AND REDESIGN UNIT FLOCCULATION AND SEDIMENTATION FOR WATER TREATMENT PLANT IN PDAM TIRTAWENING PRODUCTION UNIT I BADAKSINGA |
title_full |
EVALUATION AND REDESIGN UNIT FLOCCULATION AND SEDIMENTATION FOR WATER TREATMENT PLANT IN PDAM TIRTAWENING PRODUCTION UNIT I BADAKSINGA |
title_fullStr |
EVALUATION AND REDESIGN UNIT FLOCCULATION AND SEDIMENTATION FOR WATER TREATMENT PLANT IN PDAM TIRTAWENING PRODUCTION UNIT I BADAKSINGA |
title_full_unstemmed |
EVALUATION AND REDESIGN UNIT FLOCCULATION AND SEDIMENTATION FOR WATER TREATMENT PLANT IN PDAM TIRTAWENING PRODUCTION UNIT I BADAKSINGA |
title_sort |
evaluation and redesign unit flocculation and sedimentation for water treatment plant in pdam tirtawening production unit i badaksinga |
url |
https://digilib.itb.ac.id/gdl/view/29080 |
_version_ |
1822021930348183552 |