DETERMINATION OF BUILDING INTENSITY ON RAYA PANEMBAHAN STREET BASED ON HIGHWAY CAPACITY

<p align="justify">Development function of urban area in Pusat Kegiatan Nasional (PKN) is developed as a middle to high land use intensity settlement center. One of the focus on land use intensity arrangement is being set as building intensity. As the building intensity goes higher,...

Full description

Saved in:
Bibliographic Details
Main Author: LUTFI HAKIM TOPANESA - NIM : 15412078 , MUHAMAD
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/29085
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:29085
spelling id-itb.:290852018-07-05T15:00:55ZDETERMINATION OF BUILDING INTENSITY ON RAYA PANEMBAHAN STREET BASED ON HIGHWAY CAPACITY LUTFI HAKIM TOPANESA - NIM : 15412078 , MUHAMAD Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/29085 <p align="justify">Development function of urban area in Pusat Kegiatan Nasional (PKN) is developed as a middle to high land use intensity settlement center. One of the focus on land use intensity arrangement is being set as building intensity. As the building intensity goes higher, it will increase the trip generation that will effect the highway capacity. The building intensity at Raya Panembahan Street corridor as primary arterial road in Cirebon Metropolitan area have not been set based on its highway capacity. The regulation of high building intensity potentially decreasing the level of service. The goal of this research is to determine building intensity by its highway capacity as land use controlling tools and Transport Demand Management application. This research use highway capacity as supply factor (constrain) and building intensity (floor area ratio) as demand factor. Based on the calculation result, building intensity that set by the Kabupaten Cirebon government is not fit its highway capacity. The result on volume capacity ration by applying maximum building intensity is 2.1 and it makes Raya Panembahan Street corridor in F category of Level Of Service (worst grade). Kabupaten Cirebon government in this case should set down their building intensity ot Raya Panembahan Street.<p align="justify"> <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description <p align="justify">Development function of urban area in Pusat Kegiatan Nasional (PKN) is developed as a middle to high land use intensity settlement center. One of the focus on land use intensity arrangement is being set as building intensity. As the building intensity goes higher, it will increase the trip generation that will effect the highway capacity. The building intensity at Raya Panembahan Street corridor as primary arterial road in Cirebon Metropolitan area have not been set based on its highway capacity. The regulation of high building intensity potentially decreasing the level of service. The goal of this research is to determine building intensity by its highway capacity as land use controlling tools and Transport Demand Management application. This research use highway capacity as supply factor (constrain) and building intensity (floor area ratio) as demand factor. Based on the calculation result, building intensity that set by the Kabupaten Cirebon government is not fit its highway capacity. The result on volume capacity ration by applying maximum building intensity is 2.1 and it makes Raya Panembahan Street corridor in F category of Level Of Service (worst grade). Kabupaten Cirebon government in this case should set down their building intensity ot Raya Panembahan Street.<p align="justify"> <br />
format Final Project
author LUTFI HAKIM TOPANESA - NIM : 15412078 , MUHAMAD
spellingShingle LUTFI HAKIM TOPANESA - NIM : 15412078 , MUHAMAD
DETERMINATION OF BUILDING INTENSITY ON RAYA PANEMBAHAN STREET BASED ON HIGHWAY CAPACITY
author_facet LUTFI HAKIM TOPANESA - NIM : 15412078 , MUHAMAD
author_sort LUTFI HAKIM TOPANESA - NIM : 15412078 , MUHAMAD
title DETERMINATION OF BUILDING INTENSITY ON RAYA PANEMBAHAN STREET BASED ON HIGHWAY CAPACITY
title_short DETERMINATION OF BUILDING INTENSITY ON RAYA PANEMBAHAN STREET BASED ON HIGHWAY CAPACITY
title_full DETERMINATION OF BUILDING INTENSITY ON RAYA PANEMBAHAN STREET BASED ON HIGHWAY CAPACITY
title_fullStr DETERMINATION OF BUILDING INTENSITY ON RAYA PANEMBAHAN STREET BASED ON HIGHWAY CAPACITY
title_full_unstemmed DETERMINATION OF BUILDING INTENSITY ON RAYA PANEMBAHAN STREET BASED ON HIGHWAY CAPACITY
title_sort determination of building intensity on raya panembahan street based on highway capacity
url https://digilib.itb.ac.id/gdl/view/29085
_version_ 1822021931991302144