DETERMINATION OF BUILDING INTENSITY ON RAYA PANEMBAHAN STREET BASED ON HIGHWAY CAPACITY
<p align="justify">Development function of urban area in Pusat Kegiatan Nasional (PKN) is developed as a middle to high land use intensity settlement center. One of the focus on land use intensity arrangement is being set as building intensity. As the building intensity goes higher,...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/29085 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:29085 |
---|---|
spelling |
id-itb.:290852018-07-05T15:00:55ZDETERMINATION OF BUILDING INTENSITY ON RAYA PANEMBAHAN STREET BASED ON HIGHWAY CAPACITY LUTFI HAKIM TOPANESA - NIM : 15412078 , MUHAMAD Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/29085 <p align="justify">Development function of urban area in Pusat Kegiatan Nasional (PKN) is developed as a middle to high land use intensity settlement center. One of the focus on land use intensity arrangement is being set as building intensity. As the building intensity goes higher, it will increase the trip generation that will effect the highway capacity. The building intensity at Raya Panembahan Street corridor as primary arterial road in Cirebon Metropolitan area have not been set based on its highway capacity. The regulation of high building intensity potentially decreasing the level of service. The goal of this research is to determine building intensity by its highway capacity as land use controlling tools and Transport Demand Management application. This research use highway capacity as supply factor (constrain) and building intensity (floor area ratio) as demand factor. Based on the calculation result, building intensity that set by the Kabupaten Cirebon government is not fit its highway capacity. The result on volume capacity ration by applying maximum building intensity is 2.1 and it makes Raya Panembahan Street corridor in F category of Level Of Service (worst grade). Kabupaten Cirebon government in this case should set down their building intensity ot Raya Panembahan Street.<p align="justify"> <br /> text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
<p align="justify">Development function of urban area in Pusat Kegiatan Nasional (PKN) is developed as a middle to high land use intensity settlement center. One of the focus on land use intensity arrangement is being set as building intensity. As the building intensity goes higher, it will increase the trip generation that will effect the highway capacity. The building intensity at Raya Panembahan Street corridor as primary arterial road in Cirebon Metropolitan area have not been set based on its highway capacity. The regulation of high building intensity potentially decreasing the level of service. The goal of this research is to determine building intensity by its highway capacity as land use controlling tools and Transport Demand Management application. This research use highway capacity as supply factor (constrain) and building intensity (floor area ratio) as demand factor. Based on the calculation result, building intensity that set by the Kabupaten Cirebon government is not fit its highway capacity. The result on volume capacity ration by applying maximum building intensity is 2.1 and it makes Raya Panembahan Street corridor in F category of Level Of Service (worst grade). Kabupaten Cirebon government in this case should set down their building intensity ot Raya Panembahan Street.<p align="justify"> <br />
|
format |
Final Project |
author |
LUTFI HAKIM TOPANESA - NIM : 15412078 , MUHAMAD |
spellingShingle |
LUTFI HAKIM TOPANESA - NIM : 15412078 , MUHAMAD DETERMINATION OF BUILDING INTENSITY ON RAYA PANEMBAHAN STREET BASED ON HIGHWAY CAPACITY |
author_facet |
LUTFI HAKIM TOPANESA - NIM : 15412078 , MUHAMAD |
author_sort |
LUTFI HAKIM TOPANESA - NIM : 15412078 , MUHAMAD |
title |
DETERMINATION OF BUILDING INTENSITY ON RAYA PANEMBAHAN STREET BASED ON HIGHWAY CAPACITY |
title_short |
DETERMINATION OF BUILDING INTENSITY ON RAYA PANEMBAHAN STREET BASED ON HIGHWAY CAPACITY |
title_full |
DETERMINATION OF BUILDING INTENSITY ON RAYA PANEMBAHAN STREET BASED ON HIGHWAY CAPACITY |
title_fullStr |
DETERMINATION OF BUILDING INTENSITY ON RAYA PANEMBAHAN STREET BASED ON HIGHWAY CAPACITY |
title_full_unstemmed |
DETERMINATION OF BUILDING INTENSITY ON RAYA PANEMBAHAN STREET BASED ON HIGHWAY CAPACITY |
title_sort |
determination of building intensity on raya panembahan street based on highway capacity |
url |
https://digilib.itb.ac.id/gdl/view/29085 |
_version_ |
1822021931991302144 |