#TITLE_ALTERNATIVE#
Heavy oil is a potential resource meanwhile conventional hydrocarbon resource depleted because of exploitation, but development of heavy oil have a challenge because of the fluid characteristic that have high density and viscosity. These characteristic make heavy oil is difficult to produce. One of...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/29092 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:29092 |
---|---|
spelling |
id-itb.:290922018-05-14T10:57:00Z#TITLE_ALTERNATIVE# ZEVNI KURNIADI (NIM : 12211013), MUHAMAD Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/29092 Heavy oil is a potential resource meanwhile conventional hydrocarbon resource depleted because of exploitation, but development of heavy oil have a challenge because of the fluid characteristic that have high density and viscosity. These characteristic make heavy oil is difficult to produce. One of method to solve this challenge to increase recovery factor of heavy oil is cyclic steam stimulation. Cyclic steam stimulation is a most common method that is used for increasing recovery factor of heavy oil because this method have more advantage than another thermal method. <br /> <br /> In this study, development plan for heavy oil field has been done with CMG_STARS simulator. Before creating development plan, the injection variable sensitivity study toward recovery factor is needed This sensitivity study is done to get well optimum injection variable for development plan. The injection variable that is used for sensitivity study are injection rate, soaking time, injection time, steam quality, temperature and amount of cyclic. <br /> <br /> In this study, development plan has been done by changing kind and amount of producer well in this reservoir model. Optimum scheme is decided by considering recovery factor and economic analysis each scheme. Based on each scheme that has been done in this study, optimum development plan based economic analysis is by doing 2 vertical infill drilling. The result of this scheme are recovery factor 16.91 %, net present value 19,579,945.60 US$, return of rate 42.08% and pay out time 2.96 year for 20 year production. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Heavy oil is a potential resource meanwhile conventional hydrocarbon resource depleted because of exploitation, but development of heavy oil have a challenge because of the fluid characteristic that have high density and viscosity. These characteristic make heavy oil is difficult to produce. One of method to solve this challenge to increase recovery factor of heavy oil is cyclic steam stimulation. Cyclic steam stimulation is a most common method that is used for increasing recovery factor of heavy oil because this method have more advantage than another thermal method. <br />
<br />
In this study, development plan for heavy oil field has been done with CMG_STARS simulator. Before creating development plan, the injection variable sensitivity study toward recovery factor is needed This sensitivity study is done to get well optimum injection variable for development plan. The injection variable that is used for sensitivity study are injection rate, soaking time, injection time, steam quality, temperature and amount of cyclic. <br />
<br />
In this study, development plan has been done by changing kind and amount of producer well in this reservoir model. Optimum scheme is decided by considering recovery factor and economic analysis each scheme. Based on each scheme that has been done in this study, optimum development plan based economic analysis is by doing 2 vertical infill drilling. The result of this scheme are recovery factor 16.91 %, net present value 19,579,945.60 US$, return of rate 42.08% and pay out time 2.96 year for 20 year production. |
format |
Final Project |
author |
ZEVNI KURNIADI (NIM : 12211013), MUHAMAD |
spellingShingle |
ZEVNI KURNIADI (NIM : 12211013), MUHAMAD #TITLE_ALTERNATIVE# |
author_facet |
ZEVNI KURNIADI (NIM : 12211013), MUHAMAD |
author_sort |
ZEVNI KURNIADI (NIM : 12211013), MUHAMAD |
title |
#TITLE_ALTERNATIVE# |
title_short |
#TITLE_ALTERNATIVE# |
title_full |
#TITLE_ALTERNATIVE# |
title_fullStr |
#TITLE_ALTERNATIVE# |
title_full_unstemmed |
#TITLE_ALTERNATIVE# |
title_sort |
#title_alternative# |
url |
https://digilib.itb.ac.id/gdl/view/29092 |
_version_ |
1822021934384152576 |