Design of Evaporator and Condensorat Organic Rankine Cycle in Water Dominated Geothermal Power Plant
Indonesia is a country that has the largest geothermal potential in the worldwhich is 29 GWe. However, the use of geothermal energy for electricitygeneration is only around 4-5% of a total of 29 GWe. According to KEN(National Energy Policy), the installed capacity of 2025 is planned to b...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/29335 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |