HIGHWALL SLOPE STABILITY ANALYSIS ON PT. ABC USING THE FINITE ELEMENT METHOD
<p align="justify">The increasing of coal prices in 2017 has encourage coal mining companies trying to increase it’s coal production. PT. ABC is a coal mining company that is currently making several scenarios to optimize coal production by lowering the relative level of pit floor...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/29360 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!