PARTICULATE EMISSIONS REDUCTION SYSTEM DESIGN DUE TO THE CHANGE OF POWER PLANT’S SYSTEM ON FERTILIZER INDUSTRY

The need for fertilizers continued to increase every year. To fulfill this need, fertilizer industries have to increase their capacities. The process of making fertilizer that uses electricity from natural gas fuel must be converted to coal because of new policy changing. The power plant on the fert...

Full description

Saved in:
Bibliographic Details
Main Author: PUTRI PERTIWI, MUSTIKA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/29413
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia