STUDY AND DESIGN OF DISTRIBUTED HYBRID PV-GENERATOR-BATTERY POWER PLANT SYSTEM FOR COMMUNAL AND ADMINISTRATIVE LOAD IN SAJINGAN BESAR,KALIMANTAN,INDONESIA
<p align="justify">Indonesia consist of 16.056 island and the area is 1905 million. Due to the vast number of island and region, the value of electrification ratio of Indonesia is uneven, some region has ratio below than 50%. Not only electrification ratio, electricity demand in Indo...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/29511 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!