#TITLE_ALTERNATIVE#

In order to increase the line capacity between Cikampek and Padalarang, the Government of Indonesia is currently constructing the second track besides the existing track. These second tracks are constructing at three different location. First, the second track between Cikampek and Purwakarta (119 km...

Full description

Saved in:
Bibliographic Details
Main Author: S. BUDI WIDODO, P.
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/29999
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia