ESTIMATION OF PROBABLE MAXIMUM PRECIPITATION (PMP) AND PROBABLE MAXIMUM FLOOD (PMF) USING GSSHA MODEL (Case Study Area Upper Citarum Watershed)
<p align="justify">Probable Maximum Flood (PMF) used in the design of hydrological structures reliability and safety which its value can obtained from the Probable Maximum Precipitation (PMP). PMP is the theoretical maximum precipitation for a given duration and a particular area. Th...
Saved in:
Main Author: | ROSITA ANGGRAINI SIBUEA - NIM: 12814021, PUJI |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/30002 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ESTIMATION OF PROBABLE MAXIMUM PRECIPITATION (PMP) USING SATELLITE DATA
by: RAHMAH AGRIAMAH (NIM : 12813021), DEWI -
ESTIMATION AND UNCERTAINTY ANALYSIS OF PROBABLE MAXIMUM PRECIPITATION (PMP) CASE STUDY: WESTERN OF JAVA
by: Indriany -
SYSTEM DYNAMICS MODELLING FOR BOD TOTAL MAXIMUM DAILY LOAD (TMDL) IN UPPER CITARUM WATERSHED
by: Reza Rahmaditio, Muhammad -
STUDY OF LAND COVER CHANGES ON FLOODING IN THE UPPER CITARUM WATERSHED (CASE STUDY OF THE UPPER CITARUM WATERSHED - DAYEUHKOLOT)
by: Bandjaran Cakti, Adhitya -
STUDY OF LAND COVER CHANGESAGAINST FLOOD ON UPPER CITARUM WATERSHED(CASE STUDY OF UPPER CITARUM RIVER TO CIWIDEY RIVER)
by: Musthopa Swara, Yuddi