IMPACT OF INTERMITENCY COSTS DUE TO INJECTION OF SOLAR PHOTOVOLTAICS TO GRID ON ECONOMIC FEASIBILITY OF EXISTING POWER PLANT CASE STUDY OF BELITUNG SYSTEM
<p align="justify"> <br /> <br /> The integration of Solar Photovoltaic (PV) which is one of the intermittent and nondispatchable power plants to the electrical system will result in a number of costs defined as intermittent cost. One of the intermittent cost is the cost...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/30039 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |